| All Advisories |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: between Exit 80 ME 196 and Lewiston Service Area bridge construction — until tomorrow at about 3:30 PM EDT Comment: At mile 70.8 in New Gloucester, north and southbound lane closures are scheduled from 6:30 am to 3:30 pm for bridge work on the Snow Hill Road Bridge Monday May 20 thru Thursday May 23. last updated May 20 |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: at Exit 102 ME 9; ME 126 bridge construction — until tomorrow at about 5:00 PM EDT Comment: At mile 102 in West Gardiner, a southbound lane closure is scheduled daily from 6:30 am to 5 pm Monday, May 20 through Thursday, May 23 for bridge work. . last updated May 20 |
| |
| Roadwork - US 1 |
US 1 in both directions: from after ME 127 to before ME 144 bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14 last updated March 15 |
| |
| Roadwork - US 1 |
US 1: between ME 218 and ME 27 bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14 Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane last updated April 12 |
| |
| Roadwork - Maine 4 |
Maine 4: from after State Route 108 to before State Route 140 single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 4 Livermore beginning approximately one-half mile north of the intersection of Water Hill Road and extend northerly for three miles to just north of Goding Road. The mainline travel way will be "shimmed" to remove any rutting and to restore a cross pipe. This will be followed by paving on both the mainline and shoulders. In addition, there will be some updates to guardrail end terminals and miscellaneous guardrail repairs. There will be alternating one-way traffic assisted by flaggers during the daytime hours of 6:30 a.m. to 7:30 p.m. Motorists should expect delays during peak travel times. Weather permitting, work is anticipated to be completed by mid-June. last updated May 15 |
| |
| Roadwork - Maine 27 |
Maine 27: between State Route 238 and State Route 96 single line traffic - alternating directions because of bridge maintenance work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until May 27 Comment: Rte 27 Southport Bridge single lane traffic alternating direction due to bridge maintenance April 27 to May 27 6:00 a.m. to 6:00 p.m. Monday - Friday except holidays the draw shall open on signal every two hours at 6 a.m. , 8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., 6 p.m. last updated April 16 |
| |
| Roadwork |
Central Bridge Road in Turner: after End of Route bridge construction Comment: GREENE-TURNER, CTR BR # 3426:Replacement of Turner Center bridge # 3426 on the Greene-Turner TL which carries Center Bridge Rd over the Androscoggin River last updated February 20 |
| |
| Roadwork |
Winthrop Street in Hallowell: from after I-95 Turnpike; Whitten Road to after I-95 Turnpike; Whitten Road single line traffic - alternating directions because of road maintenance activities from 07:00am UTC -04:00 to 07:00pm UTC -04:00 on weekdays and Saturdays — until June 28 Comment: Drainage Work in Hallowell Starts May 13th...at the intersection of Spring Street and extending approximately 1,000 ft. toward Water Street starting on Monday, May 13th..Alternating one-way traffic will be controlled by flaggers during the project hours of 7 a.m. to 7 p.m. Monday through Friday and Saturdays as needed. A short section of Winthrop Street, between Second Street and Water Street, will need to be closed at times and a temporary detour set up to safely facilitate the excavations and drainage repairs in this area and to minimize delays to travelers on Water Street.Detour signs will help guide motorists around the construction activities. The detour will be removed, opening the roadway, when crews have finished for the day. last updated May 9 |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Closure - Maine 136 |
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30 Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization last updated April 30 |
| |
| Closure |
Pond Road in Manchester: between End of Route and US 202; Western Avenue;State Route 11 road closed for repairs — until Friday, at about 4:00 PM EDT Comment: Manchester Road Closure..Manchester Two cross culverts in Manchester will be replaced starting on May 21st resulting in a road closure beginning at the intersection of the Collins Road and Pond Road. Variable message boards along with additional signage will guide travelers through the 5 mile detour route from the Pond and Collins Road to Benson Road to Hallowell-Litchfield Road to Collins Mills Road to the Neck Road. The detour will be in effect from May 21st until May 24th. last updated May 14 |
| |
| Alert - Maine 3 |
Maine 3: from after US 202; State Route 9 to West Intersection with US 1 slow moving maintenance vehicle because the road is being repaved — until August 9 Comment: SEARSMONT - BELMONT, RTE 3 Beg. 0.44 mi. easterly of the TL Montville, Searsmont. extending easterly 5.21 miles to 0.96 mi easterly of the TL Belmont, Morrill Overlay with safety & drainage improvements last updated May 17 |