| Major Delays |
| Roadwork |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect. last updated April 13 |
| |
| Closure - Interstate 95 |
Interstate 95 in both directions: at Exit 42 Payne Road entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until tomorrow at about 6:00 AM EDT Comment: On Wednesday, May 22, intermittent temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Motorists should observe posted variable message signs for the most up to date closure information during this period. last updated today at 9:41 AM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 in both directions: at Exit 45 Maine Turnpike Approach entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until tomorrow at about 6:00 AM EDT Comment: On Wednesday, May 22, intermittent temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Motorists should observe posted variable message signs for the most up to date closure information during this period. last updated today at 9:45 AM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur entrance ramp closed, exit ramp closed due to bridge construction work Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp is expected to reopen on approximately May 24th. The southbound departing ramp will remain closed through October. last updated yesterday at 12:02 PM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area intermittent lane closure because of road maintenance activities — Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection. last updated March 27 |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |