Maine.gov Home State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park
Weather

 All Advisories   Text Only
Click or move mouse over icons to get more information
Accident Difficult Driving Good Driving Closure Section Affected
Alert Fair Driving Roadwork Lane Closed  Posted State Roads
 Click Here
Western Mountains Central Maine Central Maine
South Central
roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights on Maine 136 from after State Route 9; Swap Road to before I-495; Maine Turnpike because there is work on the shoulder — until September 30 last updated April 30 roadway reduced to one lane, paving operations, construction work on US 1 from after ME 136; Mallet Drive to before I-295 — until July 31 last updated May 7 slow moving maintenance vehicle on Maine 3 from after US 202; State Route 9 to West Intersection with US 1 because the road is being repaved — until August 9 last updated May 17 exit ramp closed, road reconstruction on Interstate 295 northbound at Exit 15 US 1 -- detour in operation — until October 24 last updated April 12 single line traffic - alternating directions on Maine 27 between State Route 238 and State Route 96 because of bridge maintenance work — until Monday, at about 6:00 PM EDT last updated April 16 single line traffic - alternating directions on Maine 4 from after State Route 108 to before State Route 140 due to road construction work — until June 28 last updated May 15 single line traffic - alternating directions on Winthrop Street in Hallowell from after I-95 Turnpike; Whitten Road to after I-95 Turnpike; Whitten Road because of road maintenance activities — until June 28 last updated May 9 bridge construction, width limit in effect on US 1 between ME 218 and ME 27 — until June 14 last updated April 12 bridge construction on Central Bridge Road in Turner after End of Route last updated February 20 bridge construction, width limit in effect on US 1 in both directions from after ME 127 to before ME 144 — until June 14 last updated March 15
Downeast and Acadia
Greater Portland Greater Portland Downeast and Acadia
North Arrow
Areas shaded white on the map indicate that no winter or adverse road condition
information is available at this time.
 
All Advisories
MAINE
Roadwork - US 1
US 1 in both directions: from after ME 127 to before ME 144
bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14

last updated March 15
 
Roadwork - US 1
US 1: between ME 218 and ME 27
bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14
Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane

last updated April 12
 
Roadwork - Maine 4
Maine 4: from after State Route 108 to before State Route 140
single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until June 28
Comment: Route 4 Livermore beginning approximately one-half mile north of the intersection of Water Hill Road and extend northerly for three miles to just north of Goding Road. The mainline travel way will be "shimmed" to remove any rutting and to restore a cross pipe. This will be followed by paving on both the mainline and shoulders. In addition, there will be some updates to guardrail end terminals and miscellaneous guardrail repairs. There will be alternating one-way traffic assisted by flaggers during the daytime hours of 6:30 a.m. to 7:30 p.m. Motorists should expect delays during peak travel times. Weather permitting, work is anticipated to be completed by mid-June.

last updated May 15
 
Roadwork - Maine 27
Maine 27: between State Route 238 and State Route 96
single line traffic - alternating directions because of bridge maintenance work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until Monday, at about 6:00 PM EDT
Comment: Rte 27 Southport Bridge single lane traffic alternating direction due to bridge maintenance April 27 to May 27 6:00 a.m. to 6:00 p.m. Monday - Friday except holidays the draw shall open on signal every two hours at 6 a.m. , 8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., 6 p.m.

last updated April 16
 
Roadwork
Central Bridge Road in Turner: after End of Route
bridge construction
Comment: GREENE-TURNER, CTR BR # 3426:Replacement of Turner Center bridge # 3426 on the Greene-Turner TL which carries Center Bridge Rd over the Androscoggin River

last updated February 20
 
Roadwork
Winthrop Street in Hallowell: from after I-95 Turnpike; Whitten Road to after I-95 Turnpike; Whitten Road
single line traffic - alternating directions because of road maintenance activities from 07:00am UTC -04:00 to 07:00pm UTC -04:00 on weekdays and Saturdays — until June 28
Comment: Drainage Work in Hallowell Starts May 13th...at the intersection of Spring Street and extending approximately 1,000 ft. toward Water Street starting on Monday, May 13th..Alternating one-way traffic will be controlled by flaggers during the project hours of 7 a.m. to 7 p.m. Monday through Friday and Saturdays as needed. A short section of Winthrop Street, between Second Street and Water Street, will need to be closed at times and a temporary detour set up to safely facilitate the excavations and drainage repairs in this area and to minimize delays to travelers on Water Street.Detour signs will help guide motorists around the construction activities. The detour will be removed, opening the roadway, when crews have finished for the day.

last updated May 9
 
Closure - Interstate 295
Interstate 295 northbound: at Exit 15 US 1
exit ramp closed, road reconstruction -- detour in operation — until October 24
Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot

last updated April 12
 
Closure - US 1
US 1: from after ME 136; Mallet Drive to before I-295
roadway reduced to one lane, paving operations, construction work — until July 31
Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July

last updated May 7
 
Closure - Maine 136
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike
roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30
Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization

last updated April 30
 
Alert - Maine 3
Maine 3: from after US 202; State Route 9 to West Intersection with US 1
slow moving maintenance vehicle because the road is being repaved — until August 9
Comment: SEARSMONT - BELMONT, RTE 3 Beg. 0.44 mi. easterly of the TL Montville, Searsmont. extending easterly 5.21 miles to 0.96 mi easterly of the TL Belmont, Morrill Overlay with safety & drainage improvements

last updated May 17


 