| All Advisories |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from after Exit 48 ME 25 to before Exit 53 ME 26; ME 100 bridge construction — until today at about 2:00 PM EDT Comment: Between mile 50 in Portland and mile 52 in Falmouth, a northbound lane closure is scheduled daily from 8:30 am to 2 pm Monday, May 13 through Saturday, May 18 for bridge work on the Exit 52 Interchange Bridge. last updated yesterday at 12:33 PM EDT |
| |
| Roadwork - US 202 |
US 202: from ME 115; Windham Rd to before I-95 Turnpike road construction Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction last updated February 8 |
| |
| Roadwork - US 202 |
US 202: between I-95 Turnpike and ME 11; Minot Avenue new road construction layout — until May 31 Comment: Town Auburn..Sign Installation. last updated April 12 |
| |
| Roadwork - US 302 |
US 302: from after State Route 117 to State Route 35 single line traffic - alternating directions, delays because the road is being repaved — until May 24 Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area last updated May 10 |
| |
| Roadwork - Maine 4 |
Maine 4: from after State Route 108 to before State Route 140 single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 4 Livermore beginning approximately one-half mile north of the intersection of Water Hill Road and extend northerly for three miles to just north of Goding Road. The mainline travel way will be "shimmed" to remove any rutting and to restore a cross pipe. This will be followed by paving on both the mainline and shoulders. In addition, there will be some updates to guardrail end terminals and miscellaneous guardrail repairs. There will be alternating one-way traffic assisted by flaggers during the daytime hours of 6:30 a.m. to 7:30 p.m. Motorists should expect delays during peak travel times. Weather permitting, work is anticipated to be completed by mid-June. last updated May 15 |
| |
| Roadwork |
Central Bridge Road in Turner: after End of Route bridge construction Comment: GREENE-TURNER, CTR BR # 3426:Replacement of Turner Center bridge # 3426 on the Greene-Turner TL which carries Center Bridge Rd over the Androscoggin River last updated February 20 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur entrance ramp closed, exit ramp closed due to bridge construction work Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp will re-open in approximately 7 days. The southbound departing ramp will remain closed through October. last updated May 11 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area intermittent lane closure because of road maintenance activities — Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection. last updated March 27 |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Closure - Maine 136 |
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30 Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization last updated April 30 |
| |
| Closure |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect. last updated April 13 |
| |
| Closure |
Stow Road in Fryeburg: from after End of Route to after End of Route bridge closed -- follow the detour signs Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD. last updated April 2 |