| All Advisories |
| Roadwork - Interstate 95 |
Interstate 95: from after Exit 3 US 1 to after Canadian Border construction work, paving operations — until July 5 Comment:: KITTERY, RAMP M BR #6222..Wearing Surface Replacement to Ramp M US1 / I 95 Ramp bridge # 6222 in Kittery which carries Rte 1 southbound over Rte 1 to I-95 Ramp. last updated March 28 |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from after Exit 48 ME 25 to before Exit 53 ME 26; ME 100 bridge construction — until today at about 2:00 PM EDT Comment: Between mile 50 in Portland and mile 52 in Falmouth, a northbound lane closure is scheduled daily from 8:30 am to 2 pm Monday, May 13 through Saturday, May 18 for bridge work on the Exit 52 Interchange Bridge. last updated yesterday at 12:33 PM EDT |
| |
| Roadwork - Interstate 295 |
Interstate 295 southbound: between Exit 4 US 1 and Exit 5 ME 22 brush control, work on the shoulder — Comment: 295 mile 5 there will be work on the right hand shoulder due to mowing. Will last until 3am. 8/30/12 last updated August 30 |
| |
| Roadwork - US 1A |
US 1A: between US 1A Bangor Central Loop and ME 9; ME 15 bridge construction because of bridge maintenance work — until December 20 Comment: Rte 1A in Bangor / Brewer Joshua Chaimberlain Bridge painting bridge last updated April 20 |
| |
| Roadwork - US 1 |
US 1 in both directions: between ME 35;ME 9A; Summer Street and ME 111; Alfred Road road construction, single line traffic - alternating directions because of construction work — until June 29 Comment: Rte 1 Biddeford Beginning at Beaudoin Avenue and extending 0.54 of a mile to Grayson Street. will be doing Reconstruction, Construct Shoulders, Sidewalks, Drainage Improvements.Lane closures expected daily. Traffic will be maintained at all times. last updated September 19 |
| |
| Roadwork - US 1 |
US 1: between ME 9; ME 208; Main Street and ME 112;ME 9 road construction Advisory speed limit 15 MPH from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 30, 2015 Comment: Town: Biddeford...Route: Route 1 (Elm Street...Description: Reconstruction, Construct Shoulders, Sidewalks, Drainage. Lane closures expected daily. Traffic will be maintained at all times. last updated September 20 |
| |
| Roadwork - US 1 |
US 1: between ME 98; Cascade Road and ME 9; Pine Point Road road construction — until June 14 Comment: Route: 1/9 Dunstans Corner Description: HMA overlay, lane widening, water main replacement, drainage and safety improvements last updated September 25 |
| |
| Roadwork - US 1 |
US 1 in both directions: from after ME 127 to before ME 144 bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14 last updated March 15 |
| |
| Roadwork - US 1 |
US 1: between ME 218 and ME 27 bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14 Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane last updated April 12 |
| |
| Roadwork - US 1 |
US 1: between ME 164; High Street and ME 89; Limestone Road construction work — starting 7:00 AM, 05/31/13 until October 15 Comment: Route 1 , beginning 0.10 miles north of High Street & extending northerly to a point 405 feet east of the intersection of Route 1 and Route 89..HIGHWAY RESURFACING Starting 5/31/13 ending 10/15/13 last updated May 15 |
| |
| Roadwork - US 1 |
US 1: from after ME 164; High Street to before US 1A single line traffic - alternating directions, construction work because the road is being repaved — starting 7:00 AM, 05/31/13 until October 15 Comment: WIN 19233.00 is located on Route 1 , beginning at the intersection with Bennett Drive in Caribou, & extending northerly 10.04 miles to Connor TWP, ending 0.47 miles south of Guerrette Road. last updated May 15 |
| |
| Roadwork - US 1 |
US 1: from after US 1A to before ME 162 single line traffic - alternating directions because the road is being repaved — starting 7:00 AM, 05/20/13 until May 24 Comment: Route 1...Madawaska...Route 1 in the town of Madawaska, beginning at the intersection of 3rd Street and extending westerly 1.64 miles, ending 260 feet shy of the Madawaska/Frenchville town line. last updated May 1 |
| |
| Roadwork - US 201 |
US 201: at ME 148 single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — starting 6:00 AM, 05/20/13 until July 20 Comment: Rte 201 in Madison Beginning 0.16 of a mile north of Route 148 in Madison to Fall Brook Bridge in Solon. reduced to one lane will be short delays during working hours 6:00 am to 6:00 p.m. Monday - Friday last updated May 14 |
| |
| Roadwork - US 202 |
US 202: from ME 115; Windham Rd to before I-95 Turnpike road construction Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction last updated February 8 |
| |
| Roadwork - US 202 |
US 202: between I-95 Turnpike and ME 11; Minot Avenue new road construction layout — until May 31 Comment: Town Auburn..Sign Installation. last updated April 12 |
| |
| Roadwork - US 302 |
US 302: from after State Route 117 to State Route 35 single line traffic - alternating directions, delays because the road is being repaved — until May 24 Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area last updated May 10 |
| |
| Roadwork - Maine 3 |
Maine 3: from after State Route 230; Oak Point Road to before State Route 233; Eagle Lake Road single line traffic - alternating directions, delays of uncertain duration because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — until June 28 Comment: Trenton Paving to Begin,,Route 3 construction has resumed and paving is scheduled to start Monday, May 13th ..The project included reconstruction of one-tenth of a mile of Route 230 and six-tenths of a mile of Route 3 in Trenton. To improve safety and traffic flow, the intersection of Route 230 and Route 3 have been redesigned to include a new traffic signal and turning lanes...the current schedule indicates a late June completion. Motorists may experience delays and are encouraged to allow extra travel time. last updated May 9 |
| |
| Roadwork - Maine 4 |
Maine 4: from after State Route 108 to before State Route 140 single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 4 Livermore beginning approximately one-half mile north of the intersection of Water Hill Road and extend northerly for three miles to just north of Goding Road. The mainline travel way will be "shimmed" to remove any rutting and to restore a cross pipe. This will be followed by paving on both the mainline and shoulders. In addition, there will be some updates to guardrail end terminals and miscellaneous guardrail repairs. There will be alternating one-way traffic assisted by flaggers during the daytime hours of 6:30 a.m. to 7:30 p.m. Motorists should expect delays during peak travel times. Weather permitting, work is anticipated to be completed by mid-June. last updated May 15 |
| |
| Roadwork - Maine 5 |
Maine 5: between I-95; Maine Turnpike and State Route 35 road construction — Comment: Route: Route 5; Route 112; Route 1::Description: Pavement Milling, HMA Overlay, Drainage & Safety Improvements and Other Incidental work last updated July 11 |
| |
| Roadwork - Maine 11 |
Maine 11: from after North Intersection with State Route 8 to State Route 137; Oak Street single line traffic - alternating directions because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — starting 7:00 AM, 05/26/13 until July 12 Comment: BELGRADE - OAKLAND, ROUTE 11.Highway Resurfacing: Beginning at Route 11 and extending westerly 6.34 miles to Route 8. starting 5/26/13 ending 7/5/13. last updated May 9 |
| |
| Roadwork - Maine 15 |
Maine 15: from after State Route 7 to before State Route 221 construction work, single line traffic - alternating directions due to road construction work and because the road is being repaved from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until July 27 Comment: Rte 15 in Kenduskeag to Charleston starting at the Kenduskeag Post Office extending north 9 miles to .5 of a mile south of the Deer View Lane in Charleston will be grooved pavement at times during construction and there will also be one way traffic throughout the duration of the project. last updated April 24 |
| |
| Roadwork - Maine 15 |
Maine 15 southbound: between State Route 221 and I-95; Northern Intersection with I-95 construction work because there is work on the shoulder — until September 2 Comment: 95 south exit 185 Bangor Interstate Ramp Widening and other work last updated April 25 |
| |
| Roadwork - Maine 16 |
Maine 16: between State Route 6; State Route 155 and I-95 bridge maintenance operations, width limit in effect Width limit 12 ' 0 " — until October 18 Comment: Town: Old Town ..Route: 16 over I-95 ..Deck Replacement. last updated April 16 |
| |
| Roadwork - Maine 26 |
Maine 26: from after I-295; Tukeys Bridge to before State Route 9 single line traffic - alternating directions, road reconstruction because the road is being repaved — until September 27 Comment: Portland Paving Projects..Motorists at each location will encounter alternating one-way traffic with flaggers present. Slight delays are expected. - Veranda Street at the intersection of Washington Avenue will be paved, extending to the intersection of the on-ramps to I-295. - Eastern Promenade paving starts at Atlantic Street and extends to Washington Avenue - International Parkway starts at the intersection of Congress Street and extends to the beginning of the round-about. It also includes a small portion of the Jetport Parkway - Lambert Street paving starts at the intersection of Auburn Street extending to just past the intersection of Washington Avenue Extension - Baxter Boulevard paving will take place on the part of the Boulevard that is currently closed off last updated May 14 |
| |
| Roadwork - Maine 27 |
Maine 27: between State Route 238 and State Route 96 single line traffic - alternating directions because of bridge maintenance work from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on weekdays — starting 6:00 PM, 05/28/13 until June 28 Comment: Rte 27 in Southport bridge is single lane alternating direction from May 28 to June 28 between 6 p.m. to 6 a.m. Monday - Friday except holidays the draw shall open to marine traffic on signal at 6 p.m., 8 p.m., 10 p.m., 2 a.m., 6 a.m. last updated April 16 |
| |
| Roadwork - Maine 27 |
Maine 27: between State Route 238 and State Route 96 single line traffic - alternating directions because of bridge maintenance work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until May 27 Comment: Rte 27 Southport Bridge single lane traffic alternating direction due to bridge maintenance April 27 to May 27 6:00 a.m. to 6:00 p.m. Monday - Friday except holidays the draw shall open on signal every two hours at 6 a.m. , 8 a.m., 10 a.m., 12 p.m., 2 p.m., 4 p.m., 6 p.m. last updated April 16 |
| |
| Roadwork - Maine 112 |
Maine 112: from after I-95 to before US Route 202; State Route 4A road reconstruction — until June 13 Comment: SACO-BUXTON, RTE 112: Clearing and utilities... will not be evacvation roadway untill spring 2012 last updated November 3 |
| |
| Roadwork - Maine 112 |
Maine 112: between US Route 202; State Route 4A and State Route 22 road construction — until August 30 Comment: SACO-BUXTON, RTE 112..Highway Improvements -- Beginning .58 km Notherly of Jenkins Street and extending Northern along Route 112. last updated April 8 |
| |
| Roadwork - Maine 137 |
Maine 137: from South Intersection with State Route 8 to before State Route 11; Main Street single line traffic - alternating directions because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — starting 6:00 AM, 06/27/13 until August 9 Comment:.... OAKLAND-SMITHFIELD, ROUTE 137Highway Resurfacing: Beginning at Route 11 and extending westerly 6.34 miles to Route 8. starting 6/27/13 ending 8/8/13 last updated May 9 |
| |
| Roadwork - Maine 172 |
Maine 172: at State Route 15; Main Street road construction — until August 30 Comment: Blue Hill :Routes 15/172/175/176/Tenney Hill Road/South Street/Mines Road/Beech Hill Road last updated April 3 |
| |
| Roadwork - Maine 236 |
Maine 236: between State Route 101 and State Route 91 construction work — until August 17 Comment: SOUTH BERWICK: ROUTE 236: Highway Improvements in 2 segments: 1) Reconstruction: Beginning at Main Street and continuing for 0.29 of a mile northerly to the Pan Am RR tracks; 2) Mill & Fill: Beginning at Main Street and continuing 0.15 of a mile southerly to Portland Street. last updated February 26 |
| |
| Roadwork |
Central Bridge Road in Turner: after End of Route bridge construction Comment: GREENE-TURNER, CTR BR # 3426:Replacement of Turner Center bridge # 3426 on the Greene-Turner TL which carries Center Bridge Rd over the Androscoggin River last updated February 20 |
| |
| Roadwork |
Cummings Road in South Portland: from after End of Route to Running Hill Road single line traffic - alternating directions — until June 28 Comment: Route: Cummings Road.Highway Reconstruction..starting may 13th and ending the end of June last updated May 7 |
| |
| Roadwork |
Forest Avenue in Orono: between Taylor Road and I-95 construction work — until August 30 last updated April 29 |
| |
| Roadwork |
Oakes Street in Farmington: after US 2; State Route 4 single line traffic - alternating directions because the road is being repaved — until June 7 Comment: Farmington - Pavement preservation work will take place in Farmington beginning Monday, May 6th. Motorists should expect delays while work is being done near and at the Routes 2 and 4 intersection. Specific project locations are: - Bridge Street beginning at the intersection of Oaks Street and Winter Street and extending easterly .18 miles to Routes 2 and 4. - Oakes Street beginning at the intersection of Winter Street, Temple Road and Bridge Street and extending southerly .23 miles to Routes 2 and 4. - Winter Street beginning .15 miles north of Marvel Street and extending southerly .30 miles to the intersection of Oakes Street, Temple Road and Bridge Street. Flaggers will assist motorists with a single lane of alternating one-way traffic at the intersection of Route 2 and 4. Paving will take place from May 6th with anticipated completion in the first part of June. last updated May 3 |
| |
| Roadwork |
Winthrop Street in Hallowell: from after I-95 Turnpike; Whitten Road to after I-95 Turnpike; Whitten Road single line traffic - alternating directions because of road maintenance activities from 07:00am UTC -04:00 to 07:00pm UTC -04:00 on weekdays and Saturdays — until June 28 Comment: Drainage Work in Hallowell Starts May 13th...at the intersection of Spring Street and extending approximately 1,000 ft. toward Water Street starting on Monday, May 13th..Alternating one-way traffic will be controlled by flaggers during the project hours of 7 a.m. to 7 p.m. Monday through Friday and Saturdays as needed. A short section of Winthrop Street, between Second Street and Water Street, will need to be closed at times and a temporary detour set up to safely facilitate the excavations and drainage repairs in this area and to minimize delays to travelers on Water Street.Detour signs will help guide motorists around the construction activities. The detour will be removed, opening the roadway, when crews have finished for the day. last updated May 9 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29 Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted. last updated May 2 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur entrance ramp closed, exit ramp closed due to bridge construction work Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp will re-open in approximately 7 days. The southbound departing ramp will remain closed through October. last updated May 11 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area intermittent lane closure because of road maintenance activities — Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection. last updated March 27 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: between Exit 112 ME 8; ME 11; ME 27 and Exit 120 Lyons Road entrance ramp closed due to road construction work — until Monday, at about 11:59 PM EDT Comment: 95 northbound on ramp closed due to road improvement During the closure, detour signs will guide northbound motorists along Route 104 to Exit 120 in Sidney. MaineDOT encourages drivers to plan ahead and allow extra time for travel. last updated April 19 |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: at New Hampshire State Line bridge closed No vehicles over 60000 lbs — until June 30, 2014 Comment: Rte 1 in Kittery Memorial bridge CLOSED ..permanently to Vehicle traffic. New bridge under construction ..Alternative routes for vehicle crossing between New Hampshire and Maine include the Sarah Mildred Long Bridge and I-95 high level Bridge last updated July 11 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Closure - Maine 9 |
Maine 9: between State Route 193 and State Route 192 road open to traffic due to an earlier crash — Comment: Rte 9 in Beddington is open sending traffic around accident. last updated December 10 |
| |
| Closure - Maine 102 |
Maine 102: at State Route 198 temporary traffic lights, roadway reduced to one lane because of bridge maintenance work — until May 24 Comment: Bar Harbor - MaineDOT crews begin work on the Babsons Bridge in Bar Harbor this week. This project begins at the intersection of Route 102 and extends east on Route 198 for approximately 1,500 ft. Temporary traffic lights will be on scene to assist in alternating one-way traffic through the work zone during daytime hours. Both lanes of travel will be open during the evening and overnight. This work includes sealing the surface deck to maintain the service life of this bridge. It is anticipated the project will be completed by the middle of May. last updated April 1 |
| |
| Closure - Maine 136 |
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30 Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization last updated April 30 |
| |
| Closure - Maine 179 |
Maine 179: between US Route 1A; Bangor Road and State Route 180 construction work, roadway reduced to one lane due to road work — until November 7 Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation last updated August 31 |
| |
| Closure - Maine 224 |
Maine 224: from State Route 109 to after State Route 109 road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford. last updated May 13 |
| |
| Closure |
Boundary Line Road in Bridgewater: after US 1 roadway reduced to one lane because of bridge maintenance work Comment: Bridgewater the Tannery Road bridge reduced to one lane till further notice last updated May 14 |
| |
| Closure |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect. last updated April 13 |
| |
| Closure |
Pond Road in Manchester: between End of Route and US 202; Western Avenue;State Route 11 road closed for repairs — starting 7:00 AM, 05/21/13 until May 24 Comment: Manchester Road Closure..Manchester Two cross culverts in Manchester will be replaced starting on May 21st resulting in a road closure beginning at the intersection of the Collins Road and Pond Road. Variable message boards along with additional signage will guide travelers through the 5 mile detour route from the Pond and Collins Road to Benson Road to Hallowell-Litchfield Road to Collins Mills Road to the Neck Road. The detour will be in effect from May 21st until May 24th. last updated May 14 |
| |
| Closure |
Stow Road in Fryeburg: from after End of Route to after End of Route bridge closed -- follow the detour signs Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD. last updated April 2 |
| |
| Alert - Maine 3 |
Maine 3: from after US 202; State Route 9 to West Intersection with US 1 slow moving maintenance vehicle because the road is being repaved — until August 9 Comment: SEARSMONT - BELMONT, RTE 3 Beg. 0.44 mi. easterly of the TL Montville, Searsmont. extending easterly 5.21 miles to 0.96 mi easterly of the TL Belmont, Morrill Overlay with safety & drainage improvements last updated yesterday at 6:31 AM EDT |
| |
| Alert |
New Gorham Road in Westbrook: from State Route 25; William L Clarke Drive;Wayside Drive to State Route 25; William L Clarke Drive;Wayside Drive slow moving maintenance vehicle because the road is being repaved — until May 31 Comment: Town: Gorham..New Portland Road.Pavement Overlay and Other Incidental Work New Gorham Road in Westbrook at New Portland Road Look out for a slow moving maintenance vehicle because the road is being repaved. Starting Wednesday until May 31. last updated April 29 |