Maine.gov Home State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park
Weather

 All Advisories   Text Only
Click or move mouse over icons to get more information
Accident Difficult Driving Good Driving Closure Section Affected
Alert Fair Driving Roadwork Lane Closed  Posted State Roads
 Click Here
bridge closed on US 1 at New Hampshire State Line — until June 30, 2014 last updated July 11 road closed on Maine 224 from State Route 109 to after State Route 109 because of construction work — until June 28 last updated May 13 bridge closed on Stow Road in Fryeburg from after End of Route to after End of Route -- follow the detour signs last updated April 2 single line traffic - alternating directions, delays on US 302 from after State Route 117 to State Route 35 because the road is being repaved — until Friday, at about 7:00 PM EDT last updated May 10 road construction on Maine 112 between US Route 202; State Route 4A and State Route 22 — until August 30 last updated April 8 road construction, single line traffic - alternating directions on US 1 in both directions between ME 35;ME 9A; Summer Street and ME 111; Alfred Road because of construction work — until June 29 last updated September 19 construction work on Maine 236 between State Route 101 and State Route 91 — until August 17 last updated February 26 road construction on Maine 5 between I-95; Maine Turnpike and State Route 35 — last updated July 11 road construction on US 1 between ME 9; ME 208; Main Street and ME 112;ME 9 — until June 30, 2015 last updated September 20 lane closed on Interstate 95 southbound from after New Hampshire State Line to Start of Maine Turnpike because the road is being repaved — until June 29 last updated May 2 road reconstruction on Maine 112 from after I-95 to before US Route 202; State Route 4A — until June 13 last updated November 3 road maintenance operations on Interstate 95 in both directions from after Exit 7 US 1 to before Exit 19 ME 109 — until Thursday, at about 6:00 PM EDT last updated yesterday at 12:26 AM EDT road maintenance operations on Interstate 95 northbound from after York Toll Plaza to before Exit 25 ME 35 — until Thursday, at about 6:00 PM EDT last updated yesterday at 12:32 AM EDT bridge construction on Interstate 95 southbound from after Exit 32 ME 111 to before Exit 36 I-195 — until Thursday, at about 4:00 PM EDT last updated yesterday at 12:35 AM EDT construction work, paving operations on Interstate 95 from after Exit 3 US 1 to after Canadian Border — until July 5 last updated March 28 street cleaning on Interstate 95 in both directions from after Exit 3 US 1 to before Cumberland Service Area — until Thursday, at about 3:00 PM EDT last updated yesterday at 12:23 AM EDT
North Arrow
Areas shaded white on the map indicate that no winter or adverse road condition
information is available at this time.
 
All Advisories
MAINE
Roadwork - Interstate 95
Interstate 95: from after Exit 3 US 1 to after Canadian Border
construction work, paving operations — until July 5
Comment:: KITTERY, RAMP M BR #6222..Wearing Surface Replacement to Ramp M US1 / I 95 Ramp bridge # 6222 in Kittery which carries Rte 1 southbound over Rte 1 to I-95 Ramp.

last updated March 28
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Cumberland Service Area
street cleaning — until Thursday, at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 53 in Falmouth, north and southbound rolling shoulder closures are scheduled daily from 7:30 am to 3 pm from Monday, May 20 through Thursday, May 23 for sweeping.

last updated yesterday at 12:23 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 7 US 1 to before Exit 19 ME 109
road maintenance operations — until Thursday, at about 6:00 PM EDT
Comment: Between mile 7 in York and mile 14 in Ogunquit, north and southbound lane closures are scheduled daily from 6 am to 6 pm Monday, May 20 through Thursday, May 23 for guardrail and drainage repairs. .

last updated yesterday at 12:26 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from after York Toll Plaza to before Exit 25 ME 35
road maintenance operations — until Thursday, at about 6:00 PM EDT
Comment: Between mile 18 and mile 19.5 in Wells, a northbound lane closure is scheduled daily from 6 am to 6 pm Monday, May 20 through Thursday, May 23 for guardrail and drainage repairs. .

last updated yesterday at 12:32 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: from after Exit 32 ME 111 to before Exit 36 I-195
bridge construction — until Thursday, at about 4:00 PM EDT
Comment: Between mile 33 and 32 in Biddeford, a southbound lane closure is scheduled daily from 6 am to 4 pm Monday, May 20 through Thursday, May 23 for bridge work on the Saco River Bridge. .

last updated yesterday at 12:35 AM EDT
 
Roadwork - US 1
US 1 in both directions: between ME 35;ME 9A; Summer Street and ME 111; Alfred Road
road construction, single line traffic - alternating directions because of construction work — until June 29
Comment: Rte 1 Biddeford Beginning at Beaudoin Avenue and extending 0.54 of a mile to Grayson Street. will be doing Reconstruction, Construct Shoulders, Sidewalks, Drainage Improvements.Lane closures expected daily. Traffic will be maintained at all times.

last updated September 19
 
Roadwork - US 1
US 1: between ME 9; ME 208; Main Street and ME 112;ME 9
road construction Advisory speed limit 15 MPH from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 30, 2015
Comment: Town: Biddeford...Route: Route 1 (Elm Street...Description: Reconstruction, Construct Shoulders, Sidewalks, Drainage. Lane closures expected daily. Traffic will be maintained at all times.

last updated September 20
 
Roadwork - US 302
US 302: from after State Route 117 to State Route 35
single line traffic - alternating directions, delays because the road is being repaved — until Friday, at about 7:00 PM EDT
Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area

last updated May 10
 
Roadwork - Maine 5
Maine 5: between I-95; Maine Turnpike and State Route 35
road construction —
Comment: Route: Route 5; Route 112; Route 1::Description: Pavement Milling, HMA Overlay, Drainage & Safety Improvements and Other Incidental work

last updated July 11
 
Roadwork - Maine 112
Maine 112: from after I-95 to before US Route 202; State Route 4A
road reconstruction — until June 13
Comment: SACO-BUXTON, RTE 112: Clearing and utilities... will not be evacvation roadway untill spring 2012

last updated November 3
 
Roadwork - Maine 112
Maine 112: between US Route 202; State Route 4A and State Route 22
road construction — until August 30
Comment: SACO-BUXTON, RTE 112..Highway Improvements -- Beginning .58 km Notherly of Jenkins Street and extending Northern along Route 112.

last updated April 8
 
Roadwork - Maine 236
Maine 236: between State Route 101 and State Route 91
construction work — until August 17
Comment: SOUTH BERWICK: ROUTE 236: Highway Improvements in 2 segments: 1) Reconstruction: Beginning at Main Street and continuing for 0.29 of a mile northerly to the Pan Am RR tracks; 2) Mill & Fill: Beginning at Main Street and continuing 0.15 of a mile southerly to Portland Street.

last updated February 26
 
Closure - Interstate 95
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike
lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29
Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted.

last updated May 2
 
Closure - US 1
US 1: at New Hampshire State Line
bridge closed No vehicles over 60000 lbs — until June 30, 2014
Comment: Rte 1 in Kittery Memorial bridge CLOSED ..permanently to Vehicle traffic. New bridge under construction ..Alternative routes for vehicle crossing between New Hampshire and Maine include the Sarah Mildred Long Bridge and I-95 high level Bridge

last updated July 11
 
Closure - Maine 224
Maine 224: from State Route 109 to after State Route 109
road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28
Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford.

last updated May 13
 
Closure
Stow Road in Fryeburg: from after End of Route to after End of Route
bridge closed -- follow the detour signs
Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD.

last updated April 2


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster