| Roadwork |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| | | Roadwork - Maine 179 |
Maine 179: between US Route 1A; Bangor Road and State Route 180 construction work, roadway reduced to one lane due to road work — until November 7 Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation last updated August 31 |
| | | Roadwork - Maine 230 |
Maine 230: after US Route 1; State Route 3 roadway reduced to one lane, width limit in effect because of bridge maintenance work Width limit 14 ' 0 " — until March 22 Comment: Rte 230 Ellsworth The roadway is reduced to one lane because of bridge maintenance work. There is a width limit in effect. Width limit 14'0". Until March 22.Temporary Traffic lights last updated January 17 |
|