Roadwork Section Affected
Western Mountains Northern Maine Northern Maine
Western Mountains
single line traffic - alternating directions on Maine 11 from after North Intersection with State Route 8 to State Route 137; Oak Street because the road is being repaved — starting 7:00 AM, 05/26/13 until July 12 last updated May 9
single line traffic - alternating directions on US 201 at ME 148 due to road construction work — starting 6:00 AM, 05/20/13 until July 20 last updated May 14
construction work on Maine 15 southbound between State Route 221 and I-95; Northern Intersection with I-95 because there is work on the shoulder — until September 2 last updated April 25
width limit in effect, temporary traffic lights, roadway reduced to one lane on Maine 16 between State Route 6; State Route 155 and I-95 because of bridge maintenance work — until November 15 last updated May 8
construction work, roadway reduced to one lane on Maine 179 between US Route 1A; Bangor Road and State Route 180 due to road work — until November 7 last updated August 31
bridge construction on US 1A between US 1A Bangor Central Loop and ME 9; ME 15 because of bridge maintenance work — until December 20 last updated April 20
construction work on Forest Avenue in Orono between Taylor Road and I-95 — until August 30 last updated April 29
width limit in effect, roadway reduced to one lane on Interstate 95 in both directions between Exit 133 US 201 and Exit 138 Hinckley Road because of bridge maintenance work — until November 29 last updated December 24
bridge maintenance operations, width limit in effect on Maine 16 between State Route 6; State Route 155 and I-95 — until October 18 last updated April 16
construction work, single line traffic - alternating directions on Maine 15 from after State Route 7 to before State Route 221 due to road construction work and because the road is being repaved — until July 27 last updated April 24
Eastern Maine
Capital/Mid-Coast Downeast and Acadia Eastern Maine
North Arrow
 
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road
width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29
Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone.

last updated December 24
 
Roadwork - US 1A
US 1A: between US 1A Bangor Central Loop and ME 9; ME 15
bridge construction because of bridge maintenance work — until December 20
Comment: Rte 1A in Bangor / Brewer Joshua Chaimberlain Bridge painting bridge

last updated April 20
 
Roadwork - US 201
US 201: at ME 148
single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — starting 6:00 AM, 05/20/13 until July 20
Comment: Rte 201 in Madison Beginning 0.16 of a mile north of Route 148 in Madison to Fall Brook Bridge in Solon. reduced to one lane will be short delays during working hours 6:00 am to 6:00 p.m. Monday - Friday

last updated May 14
 
Roadwork - Maine 11
Maine 11: from after North Intersection with State Route 8 to State Route 137; Oak Street
single line traffic - alternating directions because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — starting 7:00 AM, 05/26/13 until July 12
Comment: BELGRADE - OAKLAND, ROUTE 11.Highway Resurfacing: Beginning at Route 11 and extending westerly 6.34 miles to Route 8. starting 5/26/13 ending 7/5/13.

last updated May 9
 
Roadwork - Maine 15
Maine 15: from after State Route 7 to before State Route 221
construction work, single line traffic - alternating directions due to road construction work and because the road is being repaved from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until July 27
Comment: Rte 15 in Kenduskeag to Charleston starting at the Kenduskeag Post Office extending north 9 miles to .5 of a mile south of the Deer View Lane in Charleston will be grooved pavement at times during construction and there will also be one way traffic throughout the duration of the project.

last updated April 24
 
Roadwork - Maine 15
Maine 15 southbound: between State Route 221 and I-95; Northern Intersection with I-95
construction work because there is work on the shoulder — until September 2
Comment: 95 south exit 185 Bangor Interstate Ramp Widening and other work

last updated April 25
 
Roadwork - Maine 16
Maine 16: between State Route 6; State Route 155 and I-95
width limit in effect, temporary traffic lights, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 " — until November 15
Comment: Rte 16 LaGrange Lane Closure:Bridge Replacement alternating one-way with traffic signal on 12 0 wide on site detour. Delay: Up to 5 minutes due to alternating one way traffic Restriction: 12 0 one lane bridge posted at 25 MPH currently scheduled to occur from 05/06/2013 until 08/15/2013.

last updated May 8
 
Roadwork - Maine 16
Maine 16: between State Route 6; State Route 155 and I-95
bridge maintenance operations, width limit in effect Width limit 12 ' 0 " — until October 18
Comment: Town: Old Town ..Route: 16 over I-95 ..Deck Replacement.

last updated April 16
 
Roadwork - Maine 179
Maine 179: between US Route 1A; Bangor Road and State Route 180
construction work, roadway reduced to one lane due to road work — until November 7
Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation

last updated August 31
 
Roadwork
Forest Avenue in Orono: between Taylor Road and I-95
construction work — until August 30

last updated April 29


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster