Maine.gov Home State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park
Weather

 Roadwork   Show Map
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road
width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29
Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone.

last updated December 24
 
Roadwork - US 201
US 201: at ME 148
single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until July 20
Comment: Rte 201 in Madison Beginning 0.16 of a mile north of Route 148 in Madison to Fall Brook Bridge in Solon. reduced to one lane will be short delays during working hours 6:00 am to 6:00 p.m. Monday - Friday

last updated May 14
 
Roadwork - Maine 11
Maine 11: from after North Intersection with State Route 8 to State Route 137; Oak Street
single line traffic - alternating directions because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — starting 7:00 AM, 05/26/13 until July 12
Comment: BELGRADE - OAKLAND, ROUTE 11.Highway Resurfacing: Beginning at Route 11 and extending westerly 6.34 miles to Route 8. starting 5/26/13 ending 7/5/13.

last updated May 9
 
Roadwork
Oakes Street in Farmington: after US 2; State Route 4
single line traffic - alternating directions because the road is being repaved — until June 7
Comment: Farmington - Pavement preservation work will take place in Farmington beginning Monday, May 6th. Motorists should expect delays while work is being done near and at the Routes 2 and 4 intersection. Specific project locations are: - Bridge Street beginning at the intersection of Oaks Street and Winter Street and extending easterly .18 miles to Routes 2 and 4. - Oakes Street beginning at the intersection of Winter Street, Temple Road and Bridge Street and extending southerly .23 miles to Routes 2 and 4. - Winter Street beginning .15 miles north of Marvel Street and extending southerly .30 miles to the intersection of Oakes Street, Temple Road and Bridge Street. Flaggers will assist motorists with a single lane of alternating one-way traffic at the intersection of Route 2 and 4. Paving will take place from May 6th with anticipated completion in the first part of June.

last updated May 3


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster