| Roadwork |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| |
| Roadwork - US 201 |
US 201: at ME 148 single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until July 20 Comment: Rte 201 in Madison Beginning 0.16 of a mile north of Route 148 in Madison to Fall Brook Bridge in Solon. reduced to one lane will be short delays during working hours 6:00 am to 6:00 p.m. Monday - Friday last updated May 14 |
| |
| Roadwork - Maine 11 |
Maine 11: from after North Intersection with State Route 8 to State Route 137; Oak Street single line traffic - alternating directions because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — starting 7:00 AM, 05/26/13 until July 12 Comment: BELGRADE - OAKLAND, ROUTE 11.Highway Resurfacing: Beginning at Route 11 and extending westerly 6.34 miles to Route 8. starting 5/26/13 ending 7/5/13. last updated May 9 |
| |
| Roadwork |
Oakes Street in Farmington: after US 2; State Route 4 single line traffic - alternating directions because the road is being repaved — until June 7 Comment: Farmington - Pavement preservation work will take place in Farmington beginning Monday, May 6th. Motorists should expect delays while work is being done near and at the Routes 2 and 4 intersection. Specific project locations are: - Bridge Street beginning at the intersection of Oaks Street and Winter Street and extending easterly .18 miles to Routes 2 and 4. - Oakes Street beginning at the intersection of Winter Street, Temple Road and Bridge Street and extending southerly .23 miles to Routes 2 and 4. - Winter Street beginning .15 miles north of Marvel Street and extending southerly .30 miles to the intersection of Oakes Street, Temple Road and Bridge Street. Flaggers will assist motorists with a single lane of alternating one-way traffic at the intersection of Route 2 and 4. Paving will take place from May 6th with anticipated completion in the first part of June. last updated May 3 |