Maine.gov Home State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park
Weather

 Roadwork   Text Only
Click or move mouse over icons to get more information
Roadwork Section Affected
South Central South Central Greater Portland
road closed on Maine 224 from State Route 109 to after State Route 109 because of construction work — until June 28 last updated May 13
slow moving maintenance vehicle on New Gorham Road in Westbrook from State Route 25; William L Clarke Drive;Wayside Drive to State Route 25; William L Clarke Drive;Wayside Drive because the road is being repaved — until May 31 last updated April 29
entrance ramp closed, exit ramp closed on Interstate 95 southbound at Exit 52 Falmouth Spur due to bridge construction work last updated May 11
entrance ramp closed, exit ramp closed on Interstate 95 in both directions at Exit 42 Payne Road because the road is being repaved — starting 8:00 PM, 05/20/13 until tomorrow at about 6:00 AM EDT last updated May 18
exit ramp closed on Interstate 95 southbound between Exit 42 Payne Road and Exit 44 I-295 because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT last updated May 18
exit ramp closed on Interstate 95 northbound at Exit 45 Maine Turnpike Approach because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT last updated May 18
entrance ramp closed on Interstate 95 northbound at Exit 42 Payne Road because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT last updated May 18
exit ramp closed on Interstate 95 southbound at Exit 45 Maine Turnpike Approach because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT last updated May 18
single line traffic - alternating directions on Cummings Road in South Portland from after End of Route to Running Hill Road — until June 28 last updated May 7
road marking operations on Interstate 95 in both directions from after Exit 36 I-195 to before Cumberland Service Area — until today at about 3:00 PM EDT last updated today at 12:43 AM EDT
road marking operations on Interstate 95 in both directions from after Exit 3 US 1 to before Exit 42 Payne Road — starting 7:30 AM, 05/23/13 until Thursday, at about 3:00 PM EDT last updated today at 12:53 AM EDT
road construction on Maine 112 between US Route 202; State Route 4A and State Route 22 — until August 30 last updated April 8
road construction, single line traffic - alternating directions on US 1 in both directions between ME 35;ME 9A; Summer Street and ME 111; Alfred Road because of construction work — until June 29 last updated September 19
width limit in effect on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza due to bridge construction work -- affecting, westbound traffic last updated April 9
construction work on Maine 236 between State Route 101 and State Route 91 — until August 17 last updated February 26
road construction on Maine 5 between I-95; Maine Turnpike and State Route 35 — last updated July 11
width limit in effect, roadway reduced to one lane on Maine 9 between US 1; Blue Star Memorial Highway and State Route 35; Port Road due to bridge construction work — until November 29 last updated November 2
intermittent lane closure on Interstate 95 northbound from Exit 53 ME 26; ME 100 to Gray Service Area because of road maintenance activities — last updated March 27
road construction on US 1 between ME 9; ME 208; Main Street and ME 112;ME 9 — until June 30, 2015 last updated September 20
lane closed on Interstate 95 southbound from after New Hampshire State Line to Start of Maine Turnpike because the road is being repaved — until June 29 last updated May 2
bridge construction, roadway reduced to one lane, speed restrictions in force on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza -- affecting, eastbound traffic, westbound traffic last updated April 13
road reconstruction on Maine 112 from after I-95 to before US Route 202; State Route 4A — until June 13 last updated November 3
width limit in effect on Cumberland Street in Westbrook at End of Route due to bridge construction work — until December 1 last updated April 3
brush control, work on the shoulder on Interstate 295 southbound between Exit 4 US 1 and Exit 5 ME 22 — last updated August 30
road construction on US 1 between ME 98; Cascade Road and ME 9; Pine Point Road — until June 14 last updated September 25
single line traffic - alternating directions, road reconstruction on Maine 26 from after I-295; Tukeys Bridge to before State Route 9 because the road is being repaved — until September 27 last updated May 14
road maintenance operations on Interstate 95 in both directions from after Exit 7 US 1 to before Exit 19 ME 109 — until Thursday, at about 6:00 PM EDT last updated today at 12:26 AM EDT
paving operations on Interstate 95 northbound from after Exit 7 US 1 to before Exit 19 ME 109 — starting 8:00 AM, 05/21/13 until Thursday, at about 3:00 PM EDT last updated today at 12:29 AM EDT
road maintenance operations on Interstate 95 northbound from after York Toll Plaza to before Exit 25 ME 35 — until Thursday, at about 6:00 PM EDT last updated today at 12:32 AM EDT
bridge construction on Interstate 95 southbound from after Exit 32 ME 111 to before Exit 36 I-195 — until Thursday, at about 4:00 PM EDT last updated today at 12:35 AM EDT
bridge construction on Interstate 95 in both directions from after Exit 48 ME 25 to before Cumberland Service Area — until Thursday, at about 3:30 PM EDT last updated today at 12:37 AM EDT
bridge construction on Interstate 95 southbound between Exit 52 Falmouth Spur and Exit 53 ME 26; ME 100 — until today at about 2:30 PM EDT last updated today at 12:45 AM EDT
construction work, paving operations on Interstate 95 from after Exit 3 US 1 to after Canadian Border — until July 5 last updated March 28
street cleaning on Interstate 95 in both directions from after Exit 3 US 1 to before Cumberland Service Area — until Thursday, at about 3:00 PM EDT last updated today at 12:23 AM EDT
Greater Portland
North Arrow
 
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike
lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29
Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted.

last updated May 2
 
Roadwork - Interstate 95
Interstate 95: from after Exit 3 US 1 to after Canadian Border
construction work, paving operations — until July 5
Comment:: KITTERY, RAMP M BR #6222..Wearing Surface Replacement to Ramp M US1 / I 95 Ramp bridge # 6222 in Kittery which carries Rte 1 southbound over Rte 1 to I-95 Ramp.

last updated March 28
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Exit 42 Payne Road
road marking operations — starting 7:30 AM, 05/23/13 until Thursday, at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 36 in Saco, north and southbound rolling lane closures are scheduled from 7:30 am to 3 pm for line striping.

last updated today at 12:53 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Cumberland Service Area
street cleaning — until Thursday, at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 53 in Falmouth, north and southbound rolling shoulder closures are scheduled daily from 7:30 am to 3 pm from Monday, May 20 through Thursday, May 23 for sweeping.

last updated today at 12:23 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 7 US 1 to before Exit 19 ME 109
road maintenance operations — until Thursday, at about 6:00 PM EDT
Comment: Between mile 7 in York and mile 14 in Ogunquit, north and southbound lane closures are scheduled daily from 6 am to 6 pm Monday, May 20 through Thursday, May 23 for guardrail and drainage repairs. .

last updated today at 12:26 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from after Exit 7 US 1 to before Exit 19 ME 109
paving operations — starting 8:00 AM, 05/21/13 until Thursday, at about 3:00 PM EDT
Comment: Between mile 7 in York and mile 14 in Ogunquit, northbound lane closures are scheduled daily from 8 am to 3 pm Tuesday, May 21 through Thursday, May 23 for pavement repair.

last updated today at 12:29 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from after York Toll Plaza to before Exit 25 ME 35
road maintenance operations — until Thursday, at about 6:00 PM EDT
Comment: Between mile 18 and mile 19.5 in Wells, a northbound lane closure is scheduled daily from 6 am to 6 pm Monday, May 20 through Thursday, May 23 for guardrail and drainage repairs. .

last updated today at 12:32 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: from after Exit 32 ME 111 to before Exit 36 I-195
bridge construction — until Thursday, at about 4:00 PM EDT
Comment: Between mile 33 and 32 in Biddeford, a southbound lane closure is scheduled daily from 6 am to 4 pm Monday, May 20 through Thursday, May 23 for bridge work on the Saco River Bridge. .

last updated today at 12:35 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 36 I-195 to before Cumberland Service Area
road marking operations — until today at about 3:00 PM EDT
Comment: Between mile 37 in Saco and mile 53 in Falmouth, north and southbound rolling lane closures are scheduled from 9 am to 3 pm for line striping.

last updated today at 12:43 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: at Exit 42 Payne Road
entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/20/13 until tomorrow at about 6:00 AM EDT
Comment: The Exit 42 northbound entering ramp, southbound entering ramp, and northbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Tuesday, May 21st for pavement repairs.

last updated May 18
 
Roadwork - Interstate 95
Interstate 95 northbound: at Exit 42 Payne Road
entrance ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT
Comment: The Exit 42 northbound entering ramp in Scarborough will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs.

last updated May 18
 
Roadwork - Interstate 95
Interstate 95 southbound: between Exit 42 Payne Road and Exit 44 I-295
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT
Comment: The Exit 42 southbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs.

last updated May 18
 
Roadwork - Interstate 95
Interstate 95 northbound: at Exit 45 Maine Turnpike Approach
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT
Comment: The Exit 45 northbound departing ramp in South Portland will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs.

last updated May 18
 
Roadwork - Interstate 95
Interstate 95 southbound: at Exit 45 Maine Turnpike Approach
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT
Comment: The Exit 45 southbound departing ramp in South Portland will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs.

last updated May 18
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 48 ME 25 to before Cumberland Service Area
bridge construction — until Thursday, at about 3:30 PM EDT
Comment: Between mile 51 in Portland and mile 53 in Falmouth, north and southbound lane closures are scheduled daily from 8:30 am to 3:30 pm Sunday, May 19 through Thursday, May 23 for bridge work on the Exit 52 Interchange Bridge.

last updated today at 12:37 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: at Exit 52 Falmouth Spur
entrance ramp closed, exit ramp closed due to bridge construction work
Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp will re-open in approximately 7 days. The southbound departing ramp will remain closed through October.

last updated May 11
 
Roadwork - Interstate 95
Interstate 95 southbound: between Exit 52 Falmouth Spur and Exit 53 ME 26; ME 100
bridge construction — until today at about 2:30 PM EDT
Comment: At mile 52 in Falmouth, a southbound lane closure is scheduled from 9 am to 2:30 pm for bridge repairs.

last updated today at 12:45 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area
intermittent lane closure because of road maintenance activities —
Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection.

last updated March 27
 
Roadwork - Interstate 295
Interstate 295 southbound: between Exit 4 US 1 and Exit 5 ME 22
brush control, work on the shoulder —
Comment: 295 mile 5 there will be work on the right hand shoulder due to mowing. Will last until 3am. 8/30/12

last updated August 30
 
Roadwork - US 1
US 1 in both directions: between ME 35;ME 9A; Summer Street and ME 111; Alfred Road
road construction, single line traffic - alternating directions because of construction work — until June 29
Comment: Rte 1 Biddeford Beginning at Beaudoin Avenue and extending 0.54 of a mile to Grayson Street. will be doing Reconstruction, Construct Shoulders, Sidewalks, Drainage Improvements.Lane closures expected daily. Traffic will be maintained at all times.

last updated September 19
 
Roadwork - US 1
US 1: between ME 9; ME 208; Main Street and ME 112;ME 9
road construction Advisory speed limit 15 MPH from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 30, 2015
Comment: Town: Biddeford...Route: Route 1 (Elm Street...Description: Reconstruction, Construct Shoulders, Sidewalks, Drainage. Lane closures expected daily. Traffic will be maintained at all times.

last updated September 20
 
Roadwork - US 1
US 1: between ME 98; Cascade Road and ME 9; Pine Point Road
road construction — until June 14
Comment: Route: 1/9 Dunstans Corner Description: HMA overlay, lane widening, water main replacement, drainage and safety improvements

last updated September 25
 
Roadwork - Maine 5
Maine 5: between I-95; Maine Turnpike and State Route 35
road construction —
Comment: Route: Route 5; Route 112; Route 1::Description: Pavement Milling, HMA Overlay, Drainage & Safety Improvements and Other Incidental work

last updated July 11
 
Roadwork - Maine 9
Maine 9: between US 1; Blue Star Memorial Highway and State Route 35; Port Road
width limit in effect, roadway reduced to one lane due to bridge construction work Width limit 10 ' 0 " — until November 29
Comment: Town: Kennebunk::Clay Hill Bridge over the Mousam River..Bridge Replacement .The project will have a 1 lane temporary bridge NO WIDE LOADS OVER 10 FEET WIDE.

last updated November 2
 
Roadwork - Maine 26
Maine 26: from after I-295; Tukeys Bridge to before State Route 9
single line traffic - alternating directions, road reconstruction because the road is being repaved — until September 27
Comment: Portland Paving Projects..Motorists at each location will encounter alternating one-way traffic with flaggers present. Slight delays are expected. - Veranda Street at the intersection of Washington Avenue will be paved, extending to the intersection of the on-ramps to I-295. - Eastern Promenade paving starts at Atlantic Street and extends to Washington Avenue - International Parkway starts at the intersection of Congress Street and extends to the beginning of the round-about. It also includes a small portion of the Jetport Parkway - Lambert Street paving starts at the intersection of Auburn Street extending to just past the intersection of Washington Avenue Extension - Baxter Boulevard paving will take place on the part of the Boulevard that is currently closed off

last updated May 14
 
Roadwork - Maine 112
Maine 112: from after I-95 to before US Route 202; State Route 4A
road reconstruction — until June 13
Comment: SACO-BUXTON, RTE 112: Clearing and utilities... will not be evacvation roadway untill spring 2012

last updated November 3
 
Roadwork - Maine 112
Maine 112: between US Route 202; State Route 4A and State Route 22
road construction — until August 30
Comment: SACO-BUXTON, RTE 112..Highway Improvements -- Beginning .58 km Notherly of Jenkins Street and extending Northern along Route 112.

last updated April 8
 
Roadwork - Maine 224
Maine 224: from State Route 109 to after State Route 109
road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28
Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford.

last updated May 13
 
Roadwork - Maine 236
Maine 236: between State Route 101 and State Route 91
construction work — until August 17
Comment: SOUTH BERWICK: ROUTE 236: Highway Improvements in 2 segments: 1) Reconstruction: Beginning at Main Street and continuing for 0.29 of a mile northerly to the Pan Am RR tracks; 2) Mill & Fill: Beginning at Main Street and continuing 0.15 of a mile southerly to Portland Street.

last updated February 26
 
Roadwork
Cumberland Street in Westbrook: at End of Route
width limit in effect due to bridge construction work Width limit 11 ' 0 " — until December 1
Comment: Westbrook Cumberland St replacing the Cumberland Mills Bridge over the Presumpscot River .27 of a mile northerly of Main St.Two Lane Temporary Bridge opening 5/08/12.This bridge is not designed for tractor trailer trucks. All truck traffic should use designated truck detour route Rt 25 Warren Ave Forest Ave.E. Bridge St.Cumberland St Restrictions Effective 4/6/12 road width will be restricted to 11 lanes during the day and will have Lane Closures at night for Utility Work. This restriction until Mid July.

last updated April 3
 
Roadwork
Cummings Road in South Portland: from after End of Route to Running Hill Road
single line traffic - alternating directions — until June 28
Comment: Route: Cummings Road.Highway Reconstruction..starting may 13th and ending the end of June

last updated May 7
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic
Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect.

last updated April 13
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
width limit in effect due to bridge construction work -- affecting, westbound traffic
Comment: Effective Monday, April 16, 2012, because of bridge work on the Falmouth Spur, there will be a restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to enter the Maine Turnpike from the Falmouth Spur . This restriction only affects vehicles traveling westbound on the Falmouth Spur. Eastbound traffic departing the Maine turnpike is not affected. This restriction will remain in effect until further notice.

last updated April 9
 
Roadwork
New Gorham Road in Westbrook: from State Route 25; William L Clarke Drive;Wayside Drive to State Route 25; William L Clarke Drive;Wayside Drive
slow moving maintenance vehicle because the road is being repaved — until May 31
Comment: Town: Gorham..New Portland Road.Pavement Overlay and Other Incidental Work New Gorham Road in Westbrook at New Portland Road Look out for a slow moving maintenance vehicle because the road is being repaved. Starting Wednesday until May 31.

last updated April 29


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster