 Roadwork   Text Only
Click or move mouse over icons to get more information
Roadwork Section Affected
South Central South Central Capital/Mid-Coast
Southern Maine
roadway reduced to one lane, paving operations, construction work on US 1 from after ME 136; Mallet Drive to before I-295 — until July 31 last updated May 7
exit ramp closed, road reconstruction on Interstate 295 northbound at Exit 15 US 1 -- detour in operation — until October 24 last updated April 12
slow moving maintenance vehicle on New Gorham Road in Westbrook from State Route 25; William L Clarke Drive;Wayside Drive to State Route 25; William L Clarke Drive;Wayside Drive because the road is being repaved — until May 31 last updated April 29
entrance ramp closed, exit ramp closed on Interstate 95 southbound at Exit 52 Falmouth Spur due to bridge construction work last updated yesterday at 12:02 PM EDT
entrance ramp closed, exit ramp closed on Interstate 95 in both directions at Exit 42 Payne Road because the road is being repaved — starting 8:00 PM, 05/22/13 until tomorrow at about 6:00 AM EDT last updated today at 9:41 AM EDT
entrance ramp closed, exit ramp closed on Interstate 95 in both directions at Exit 45 Maine Turnpike Approach because the road is being repaved — starting 8:00 PM, 05/22/13 until tomorrow at about 6:00 AM EDT last updated today at 9:45 AM EDT
single line traffic - alternating directions on Cummings Road in South Portland from after End of Route to Running Hill Road — until June 28 last updated May 7
road marking operations on Interstate 95 in both directions from after Exit 3 US 1 to before Exit 42 Payne Road — starting 7:30 AM, 05/23/13 until tomorrow at about 3:00 PM EDT last updated May 20
road construction on Maine 112 between US Route 202; State Route 4A and State Route 22 — until August 30 last updated April 8
width limit in effect on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza due to bridge construction work -- affecting, westbound traffic last updated April 9
road construction on Maine 5 between I-95; Maine Turnpike and State Route 35 — last updated July 11
intermittent lane closure on Interstate 95 northbound from Exit 53 ME 26; ME 100 to Gray Service Area because of road maintenance activities — last updated March 27
road construction on US 202 from ME 115; Windham Rd to before I-95 Turnpike last updated February 8
bridge construction, roadway reduced to one lane, speed restrictions in force on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza -- affecting, eastbound traffic, westbound traffic last updated April 13
road reconstruction on Maine 112 from after I-95 to before US Route 202; State Route 4A — until June 13 last updated November 3
width limit in effect on Cumberland Street in Westbrook at End of Route due to bridge construction work — until December 1 last updated April 3
brush control, work on the shoulder on Interstate 295 southbound between Exit 4 US 1 and Exit 5 ME 22 — last updated August 30
road construction on US 1 between ME 98; Cascade Road and ME 9; Pine Point Road — until June 14 last updated September 25
single line traffic - alternating directions, road reconstruction on Maine 26 from after I-295; Tukeys Bridge to before State Route 9 because the road is being repaved — until September 27 last updated May 14
bridge construction on Interstate 95 in both directions from after Exit 48 ME 25 to before Cumberland Service Area — until tomorrow at about 3:30 PM EDT last updated May 20
street cleaning on Interstate 95 in both directions from after Exit 3 US 1 to before Cumberland Service Area — until tomorrow at about 3:00 PM EDT last updated May 20
Capital/Mid-Coast
Southern Maine Southern Maine
North Arrow
 
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Exit 42 Payne Road
road marking operations — starting 7:30 AM, 05/23/13 until tomorrow at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 36 in Saco, north and southbound rolling lane closures are scheduled from 7:30 am to 3 pm for line striping.

last updated May 20
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Cumberland Service Area
street cleaning — until tomorrow at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 53 in Falmouth, north and southbound rolling shoulder closures are scheduled daily from 7:30 am to 3 pm from Monday, May 20 through Thursday, May 23 for sweeping.

last updated May 20
 
Roadwork - Interstate 95
Interstate 95 in both directions: at Exit 42 Payne Road
entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until tomorrow at about 6:00 AM EDT
Comment: On Wednesday, May 22, intermittent temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Motorists should observe posted variable message signs for the most up to date closure information during this period.

last updated today at 9:41 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: at Exit 45 Maine Turnpike Approach
entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until tomorrow at about 6:00 AM EDT
Comment: On Wednesday, May 22, intermittent temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Motorists should observe posted variable message signs for the most up to date closure information during this period.

last updated today at 9:45 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 48 ME 25 to before Cumberland Service Area
bridge construction — until tomorrow at about 3:30 PM EDT
Comment: Between mile 51 in Portland and mile 53 in Falmouth, north and southbound lane closures are scheduled daily from 8:30 am to 3:30 pm Sunday, May 19 through Thursday, May 23 for bridge work on the Exit 52 Interchange Bridge.

last updated May 20
 
Roadwork - Interstate 95
Interstate 95 southbound: at Exit 52 Falmouth Spur
entrance ramp closed, exit ramp closed due to bridge construction work
Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp is expected to reopen on approximately May 24th. The southbound departing ramp will remain closed through October.

last updated yesterday at 12:02 PM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area
intermittent lane closure because of road maintenance activities —
Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection.

last updated March 27
 
Roadwork - Interstate 295
Interstate 295 southbound: between Exit 4 US 1 and Exit 5 ME 22
brush control, work on the shoulder —
Comment: 295 mile 5 there will be work on the right hand shoulder due to mowing. Will last until 3am. 8/30/12

last updated August 30
 
Roadwork - Interstate 295
Interstate 295 northbound: at Exit 15 US 1
exit ramp closed, road reconstruction -- detour in operation — until October 24
Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot

last updated April 12
 
Roadwork - US 1
US 1: between ME 98; Cascade Road and ME 9; Pine Point Road
road construction — until June 14
Comment: Route: 1/9 Dunstans Corner Description: HMA overlay, lane widening, water main replacement, drainage and safety improvements

last updated September 25
 
Roadwork - US 1
US 1: from after ME 136; Mallet Drive to before I-295
roadway reduced to one lane, paving operations, construction work — until July 31
Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July

last updated May 7
 
Roadwork - US 202
US 202: from ME 115; Windham Rd to before I-95 Turnpike
road construction
Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction

last updated February 8
 
Roadwork - Maine 5
Maine 5: between I-95; Maine Turnpike and State Route 35
road construction —
Comment: Route: Route 5; Route 112; Route 1::Description: Pavement Milling, HMA Overlay, Drainage & Safety Improvements and Other Incidental work

last updated July 11
 
Roadwork - Maine 26
Maine 26: from after I-295; Tukeys Bridge to before State Route 9
single line traffic - alternating directions, road reconstruction because the road is being repaved — until September 27
Comment: Portland Paving Projects..Motorists at each location will encounter alternating one-way traffic with flaggers present. Slight delays are expected. - Veranda Street at the intersection of Washington Avenue will be paved, extending to the intersection of the on-ramps to I-295. - Eastern Promenade paving starts at Atlantic Street and extends to Washington Avenue - International Parkway starts at the intersection of Congress Street and extends to the beginning of the round-about. It also includes a small portion of the Jetport Parkway - Lambert Street paving starts at the intersection of Auburn Street extending to just past the intersection of Washington Avenue Extension - Baxter Boulevard paving will take place on the part of the Boulevard that is currently closed off

last updated May 14
 
Roadwork - Maine 112
Maine 112: from after I-95 to before US Route 202; State Route 4A
road reconstruction — until June 13
Comment: SACO-BUXTON, RTE 112: Clearing and utilities... will not be evacvation roadway untill spring 2012

last updated November 3
 
Roadwork - Maine 112
Maine 112: between US Route 202; State Route 4A and State Route 22
road construction — until August 30
Comment: SACO-BUXTON, RTE 112..Highway Improvements -- Beginning .58 km Notherly of Jenkins Street and extending Northern along Route 112.

last updated April 8
 
Roadwork
Cumberland Street in Westbrook: at End of Route
width limit in effect due to bridge construction work Width limit 11 ' 0 " — until December 1
Comment: Westbrook Cumberland St replacing the Cumberland Mills Bridge over the Presumpscot River .27 of a mile northerly of Main St.Two Lane Temporary Bridge opening 5/08/12.This bridge is not designed for tractor trailer trucks. All truck traffic should use designated truck detour route Rt 25 Warren Ave Forest Ave.E. Bridge St.Cumberland St Restrictions Effective 4/6/12 road width will be restricted to 11 lanes during the day and will have Lane Closures at night for Utility Work. This restriction until Mid July.

last updated April 3
 
Roadwork
Cummings Road in South Portland: from after End of Route to Running Hill Road
single line traffic - alternating directions — until June 28
Comment: Route: Cummings Road.Highway Reconstruction..starting may 13th and ending the end of June

last updated May 7
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic
Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect.

last updated April 13
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
width limit in effect due to bridge construction work -- affecting, westbound traffic
Comment: Effective Monday, April 16, 2012, because of bridge work on the Falmouth Spur, there will be a restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to enter the Maine Turnpike from the Falmouth Spur . This restriction only affects vehicles traveling westbound on the Falmouth Spur. Eastbound traffic departing the Maine turnpike is not affected. This restriction will remain in effect until further notice.

last updated April 9
 
Roadwork
New Gorham Road in Westbrook: from State Route 25; William L Clarke Drive;Wayside Drive to State Route 25; William L Clarke Drive;Wayside Drive
slow moving maintenance vehicle because the road is being repaved — until May 31
Comment: Town: Gorham..New Portland Road.Pavement Overlay and Other Incidental Work New Gorham Road in Westbrook at New Portland Road Look out for a slow moving maintenance vehicle because the road is being repaved. Starting Wednesday until May 31.

last updated April 29


 

©2008 Maine Department of Transportation