| Roadwork |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from Exit 42 Payne Road to Exit 44 I-295 bridge construction — until November 30 last updated August 6 |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: between Exit 44 I-295 and Exit 45 Maine Turnpike Approach bridge construction, roadway reduced to one lane, speed restrictions in force — until today at about 5:00 PM EDT last updated yesterday at 12:01 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from Exit 48 ME 25 to Exit 52 Falmouth Spur bridge maintenance operations, roadway reduced to one lane, speed restrictions in force — until today at about 11:59 PM EDT last updated yesterday at 1:51 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from Exit 52 Falmouth Spur to Exit 53 ME 26; ME 100 entrance ramp closed due to bridge construction work -- consider using an alternate route — until July 13, 2011 Comment: At Exit 52 in Falmouth the northbound entering ramp will be closed at 5am and remained closed for one year due to bridge construction at the Presumpscot River Bridge. Motorists should seek alternative routes. last updated July 30 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: between Exit 52 Falmouth Spur and Exit 53 ME 26; ME 100 bridge construction, roadway reduced to one lane, speed restrictions in force — until tomorrow at about 2:00 AM EDT Comment: At mile 51.5 in Falmouth north and southbound lane closures are scheduled from 5am to 2am at the Presumpscot River Bridge for bridge work. 45 mph work zone speed limits are in effect. last updated yesterday at 12:18 PM EDT |
| |
| Roadwork - Interstate 295 |
Interstate 295 southbound: from Exit 1 Maine Turnpike Approach to Exit 11 Falmouth Spur roadway reduced to one lane due to road work Advisory speed limit 55 MPH — until September 26 Comment: Audio Text: .Road Construction.. southbound.night work from 8pm to 6am.. last updated June 30 |
| |
| Roadwork - Interstate 295 |
Interstate 295 northbound: at Exit 11 Falmouth Spur roadway reduced to one lane, short delays due to road construction work Advisory speed limit 55 MPH from 08:00pm UTC -04:00 to 06:00am UTC -04:00 on weekdays — until September 26 Comment: Audio Text: Town of Scarbough,south Portland Falmouth Cumberland Reduced to one lane.. Northbound .. night work from 8 pm to 6am... last updated September 7 |
| |
| Roadwork - Interstate 295 |
Interstate 295 northbound: between Exit 15 US 1 and Exit 17 US 1 roadway reduced to one lane because of bridge maintenance work Advisory speed limit 55 MPH — starting 9:00 PM, 09/10/10 until Monday, at about 1:00 PM EDT Comment: Audio Text: Alert!) I-295 northbound ....will be reduced to one lane at the Royal River Bridge in Yarmouth from 9PM Friday, Sept. 10 through 12Noon Monday, Sept. 13. SIGNIFICANT DELAYS ARE EXPECTED. Drivers should use alternate routes including the Maine Turnpike. from 9PM Friday, Sept. 10 through 12Noon Monday, Sept. 13. SIGNIFICANT DELAYS ARE EXPECTED. Drivers should use alternate routes including the Maine Turnpike. last updated September 7 |
| |
| Roadwork - US 202 |
US 202: from ME 115; Windham Rd to before I-95 Turnpike road construction Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction last updated February 8 |
| |
| Roadwork - Maine 26 |
Maine 26: between I-95 and State Route 115; State Route 4 roadway reduced to one lane, construction work due to bridge construction work — until June 1, 2012 Comment: Construction work on Rte 100/26 at the Railroad crossing Bridge. Intermittant Lane closures and delays last updated April 1 |
| |
| Roadwork - Maine 114 |
Maine 114 in both directions: at I-95 width limit in effect due to bridge construction work Comment: Effective Monday, August 16, 2010, because of bridge work on the Gorham Road Underpass over the Maine Turnpike in Scarborough, there will be a restriction for wide loads on the Gorham Road as follows: Such vehicles and loads will not be allowed to travel through on Gorham Road between the Running Hill Road and the Payne Road. The restriction does not affect Maine Turnpike Traffic. last updated August 5 |
| |
| Roadwork |
Falmouth Spur: from I-95 Turnpike to Falmouth Toll Plaza bridge maintenance operations, roadway reduced to one lane, speed restrictions in force -- eastbound traffic, westbound traffic — until November 26 Comment: At Exit 52 in Falmouth on the Falmouth Spur east and westbound permanent lane closures are in place at the Blackstrap and Maine Central Railroad Bridges for for bridge rehabilitation. The ongoing work is scheduled to be completed early in 2011. 35 mph work zone speed limits are in effect. last updated July 28 |
| |
| Roadwork |
Payne Road in Scarborough: after Beech Ridge Road night time construction work due to road construction work — until September 18 Comment: Audio Text: Payne Road in Scarborough last updated August 10 |