| Roadwork |
| Roadwork - US 1 |
US 1: between ME 164; High Street and ME 89; Limestone Road construction work — starting 7:00 AM, 05/31/13 until October 15 Comment: Route 1 , beginning 0.10 miles north of High Street & extending northerly to a point 405 feet east of the intersection of Route 1 and Route 89..HIGHWAY RESURFACING Starting 5/31/13 ending 10/15/13 last updated May 15 |
| | | Roadwork - US 1 |
US 1: from after ME 164; High Street to before US 1A single line traffic - alternating directions, construction work because the road is being repaved — starting 7:00 AM, 05/31/13 until October 15 Comment: WIN 19233.00 is located on Route 1 , beginning at the intersection with Bennett Drive in Caribou, & extending northerly 10.04 miles to Connor TWP, ending 0.47 miles south of Guerrette Road. last updated May 15 |
| | | Roadwork - US 1 |
US 1: from after US 1A to before ME 162 single line traffic - alternating directions because the road is being repaved — until Friday, at about 6:00 PM EDT Comment: Route 1...Madawaska...Route 1 in the town of Madawaska, beginning at the intersection of 3rd Street and extending westerly 1.64 miles, ending 260 feet shy of the Madawaska/Frenchville town line. last updated May 1 |
| | | Roadwork |
Boundary Line Road in Bridgewater: after US 1 roadway reduced to one lane because of bridge maintenance work Comment: Bridgewater the Tannery Road bridge reduced to one lane till further notice last updated May 14 |
|