Maine.gov Home
State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Weather Forecasts Weather Alerts Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park

 Roadwork   Text Only
Click or move mouse over icons to get more information
Roadwork Section Affected
single line traffic - alternating directions on Maine 11 from after State Route 227; Frenchville Road to after State Route 227; Frenchville Road because the road is being repaved — until October 31 last updated July 20
width limit in effect, roadway reduced to one lane on Interstate 95 southbound between Exit 276 ME 159 and Exit 286 Smyrna Oakfield; River Road because of bridge maintenance work — until November 25 last updated May 13
bridge construction on US 2 between ME 158 and ME 159 — until October 15, 2011 last updated May 17
bridge construction on Smyrna Road in Oakfield after I-95 because of bridge demolition work -- detour in operation — until July 15, 2011 last updated June 10
Central Maine Eastern Maine Eastern Maine
North Arrow
 
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 southbound: between Exit 276 ME 159 and Exit 286 Smyrna Oakfield; River Road
width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 14 ' 0 " — until November 25
Comment: I -95 southbound in Oakfield reduced to one lane for Bridge Maintenance operations

last updated May 13
 
Roadwork - US 2
US 2: between ME 158 and ME 159
bridge construction — until October 15, 2011
Comment: Audio Text: ISLAND FALLS...Bridge Replacement.....

last updated May 17
 
Roadwork - Maine 11
Maine 11: from after State Route 227; Frenchville Road to after State Route 227; Frenchville Road
single line traffic - alternating directions because the road is being repaved — until October 31
Comment: Audio Text: WALLAGRASS RTE 11 ,,,

last updated July 20
 
Roadwork
Smyrna Road in Oakfield: after I-95
bridge construction because of bridge demolition work -- detour in operation — until July 15, 2011
Comment: Audio Text: ..Oakfield..Main Street, Village Bridge over East Branch of Mattawamkeag....

last updated June 10


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster