| Roadwork |
| Roadwork - Interstate 95 |
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29 Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted. last updated May 2 |
| |
| Roadwork - Interstate 95 |
Interstate 95: from after Exit 3 US 1 to after Canadian Border construction work, paving operations — until July 5 Comment:: KITTERY, RAMP M BR #6222..Wearing Surface Replacement to Ramp M US1 / I 95 Ramp bridge # 6222 in Kittery which carries Rte 1 southbound over Rte 1 to I-95 Ramp. last updated March 28 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: at Exit 42 Payne Road exit ramp closed because the road is being repaved — until tomorrow at about 6:00 AM EDT Comment: The Exit 42 north and southbound departing ramps in Scarborough will be closed for pavement repairs from 8 pm to 6 am on Monday, May 20th. last updated yesterday at 2:32 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: at Exit 42 Payne Road entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/20/13 until Tuesday, at about 6:00 AM EDT Comment: The Exit 42 northbound entering ramp, southbound entering ramp, and northbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Tuesday, May 21st for pavement repairs. last updated yesterday at 2:44 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: at Exit 42 Payne Road entrance ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT Comment: The Exit 42 northbound entering ramp in Scarborough will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs. last updated yesterday at 3:09 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: between Exit 42 Payne Road and Exit 44 I-295 exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT Comment: The Exit 42 southbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs. last updated yesterday at 2:56 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: at Exit 45 Maine Turnpike Approach exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT Comment: The Exit 45 northbound departing ramp in South Portland will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs. last updated yesterday at 3:05 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: at Exit 45 Maine Turnpike Approach exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT Comment: The Exit 45 southbound departing ramp in South Portland will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs. last updated yesterday at 3:11 PM EDT |
| |
| Roadwork - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur entrance ramp closed, exit ramp closed due to bridge construction work Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp will re-open in approximately 7 days. The southbound departing ramp will remain closed through October. last updated May 11 |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area intermittent lane closure because of road maintenance activities — Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection. last updated March 27 |
| |
| Roadwork - Interstate 95 |
Interstate 95 northbound: between Exit 112 ME 8; ME 11; ME 27 and Exit 120 Lyons Road entrance ramp closed due to road construction work — until tomorrow at about 11:59 PM EDT Comment: 95 northbound on ramp closed due to road improvement During the closure, detour signs will guide northbound motorists along Route 104 to Exit 120 in Sidney. MaineDOT encourages drivers to plan ahead and allow extra time for travel. last updated April 19 |
| |
| Roadwork - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| |
| Roadwork - Interstate 295 |
Interstate 295 southbound: between Exit 4 US 1 and Exit 5 ME 22 brush control, work on the shoulder — Comment: 295 mile 5 there will be work on the right hand shoulder due to mowing. Will last until 3am. 8/30/12 last updated August 30 |
| |
| Roadwork - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Roadwork - US 1A |
US 1A: between US 1A Bangor Central Loop and ME 9; ME 15 bridge construction because of bridge maintenance work — until December 20 Comment: Rte 1A in Bangor / Brewer Joshua Chaimberlain Bridge painting bridge last updated April 20 |
| |
| Roadwork - US 1 |
US 1 in both directions: between ME 35;ME 9A; Summer Street and ME 111; Alfred Road road construction, single line traffic - alternating directions because of construction work — until June 29 Comment: Rte 1 Biddeford Beginning at Beaudoin Avenue and extending 0.54 of a mile to Grayson Street. will be doing Reconstruction, Construct Shoulders, Sidewalks, Drainage Improvements.Lane closures expected daily. Traffic will be maintained at all times. last updated September 19 |
| |
| Roadwork - US 1 |
US 1: between ME 9; ME 208; Main Street and ME 112;ME 9 road construction Advisory speed limit 15 MPH from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 30, 2015 Comment: Town: Biddeford...Route: Route 1 (Elm Street...Description: Reconstruction, Construct Shoulders, Sidewalks, Drainage. Lane closures expected daily. Traffic will be maintained at all times. last updated September 20 |
| |
| Roadwork - US 1 |
US 1: between ME 98; Cascade Road and ME 9; Pine Point Road road construction — until June 14 Comment: Route: 1/9 Dunstans Corner Description: HMA overlay, lane widening, water main replacement, drainage and safety improvements last updated September 25 |
| |
| Roadwork - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Roadwork - US 1 |
US 1 in both directions: from after ME 127 to before ME 144 bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14 last updated March 15 |
| |
| Roadwork - US 1 |
US 1: between ME 218 and ME 27 bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14 Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane last updated April 12 |
| |
| Roadwork - US 1 |
US 1: between ME 164; High Street and ME 89; Limestone Road construction work — starting 7:00 AM, 05/31/13 until October 15 Comment: Route 1 , beginning 0.10 miles north of High Street & extending northerly to a point 405 feet east of the intersection of Route 1 and Route 89..HIGHWAY RESURFACING Starting 5/31/13 ending 10/15/13 last updated May 15 |
| |
| Roadwork - US 1 |
US 1: from after ME 164; High Street to before US 1A single line traffic - alternating directions, construction work because the road is being repaved — starting 7:00 AM, 05/31/13 until October 15 Comment: WIN 19233.00 is located on Route 1 , beginning at the intersection with Bennett Drive in Caribou, & extending northerly 10.04 miles to Connor TWP, ending 0.47 miles south of Guerrette Road. last updated May 15 |
| |
| Roadwork - US 1 |
US 1: from after US 1A to before ME 162 single line traffic - alternating directions because the road is being repaved — starting 7:00 AM, 05/20/13 until May 24 Comment: Route 1...Madawaska...Route 1 in the town of Madawaska, beginning at the intersection of 3rd Street and extending westerly 1.64 miles, ending 260 feet shy of the Madawaska/Frenchville town line. last updated May 1 |
| |
| Roadwork - US 201 |
US 201: at ME 148 single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — starting 6:00 AM, 05/20/13 until July 20 Comment: Rte 201 in Madison Beginning 0.16 of a mile north of Route 148 in Madison to Fall Brook Bridge in Solon. reduced to one lane will be short delays during working hours 6:00 am to 6:00 p.m. Monday - Friday last updated May 14 |
| |
| Roadwork - US 202 |
US 202: from ME 115; Windham Rd to before I-95 Turnpike road construction Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction last updated February 8 |
| |
| Roadwork - US 202 |
US 202: between I-95 Turnpike and ME 11; Minot Avenue new road construction layout — until May 31 Comment: Town Auburn..Sign Installation. last updated April 12 |
| |
| Roadwork - US 302 |
US 302: from after State Route 117 to State Route 35 single line traffic - alternating directions, delays because the road is being repaved — until May 24 Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area last updated May 10 |
| |
| Roadwork |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect. last updated April 13 |
| |
| Roadwork |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza width limit in effect due to bridge construction work -- affecting, westbound traffic Comment: Effective Monday, April 16, 2012, because of bridge work on the Falmouth Spur, there will be a restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to enter the Maine Turnpike from the Falmouth Spur . This restriction only affects vehicles traveling westbound on the Falmouth Spur. Eastbound traffic departing the Maine turnpike is not affected. This restriction will remain in effect until further notice. last updated April 9 |