| Roadwork |
| Roadwork - Interstate 95 |
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29 Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted. last updated May 2 |
| |
| Roadwork - Interstate 95 |
Interstate 95: from after Exit 3 US 1 to after Canadian Border construction work, paving operations — until July 5 Comment:: KITTERY, RAMP M BR #6222..Wearing Surface Replacement to Ramp M US1 / I 95 Ramp bridge # 6222 in Kittery which carries Rte 1 southbound over Rte 1 to I-95 Ramp. last updated March 28 |
| |
| Roadwork - US 1 |
US 1 in both directions: between ME 35;ME 9A; Summer Street and ME 111; Alfred Road road construction, single line traffic - alternating directions because of construction work — until June 29 Comment: Rte 1 Biddeford Beginning at Beaudoin Avenue and extending 0.54 of a mile to Grayson Street. will be doing Reconstruction, Construct Shoulders, Sidewalks, Drainage Improvements.Lane closures expected daily. Traffic will be maintained at all times. last updated September 19 |
| |
| Roadwork - US 1 |
US 1: between ME 9; ME 208; Main Street and ME 112;ME 9 road construction Advisory speed limit 15 MPH from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 30, 2015 Comment: Town: Biddeford...Route: Route 1 (Elm Street...Description: Reconstruction, Construct Shoulders, Sidewalks, Drainage. Lane closures expected daily. Traffic will be maintained at all times. last updated September 20 |
| |
| Roadwork - US 302 |
US 302: from after State Route 117 to State Route 35 single line traffic - alternating directions, delays because the road is being repaved — until May 24 Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area last updated May 10 |
| |
| Roadwork - Maine 5 |
Maine 5: between I-95; Maine Turnpike and State Route 35 road construction — Comment: Route: Route 5; Route 112; Route 1::Description: Pavement Milling, HMA Overlay, Drainage & Safety Improvements and Other Incidental work last updated July 11 |
| |
| Roadwork - Maine 9 |
Maine 9: between US 1; Blue Star Memorial Highway and State Route 35; Port Road width limit in effect, roadway reduced to one lane due to bridge construction work Width limit 10 ' 0 " — until November 29 Comment: Town: Kennebunk::Clay Hill Bridge over the Mousam River..Bridge Replacement .The project will have a 1 lane temporary bridge NO WIDE LOADS OVER 10 FEET WIDE. last updated November 2 |
| |
| Roadwork - Maine 112 |
Maine 112: from after I-95 to before US Route 202; State Route 4A road reconstruction — until June 13 Comment: SACO-BUXTON, RTE 112: Clearing and utilities... will not be evacvation roadway untill spring 2012 last updated November 3 |
| |
| Roadwork - Maine 112 |
Maine 112: between US Route 202; State Route 4A and State Route 22 road construction — until August 30 Comment: SACO-BUXTON, RTE 112..Highway Improvements -- Beginning .58 km Notherly of Jenkins Street and extending Northern along Route 112. last updated April 8 |
| |
| Roadwork - Maine 224 |
Maine 224: from State Route 109 to after State Route 109 road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford. last updated May 13 |
| |
| Roadwork - Maine 236 |
Maine 236: between State Route 101 and State Route 91 construction work — until August 17 Comment: SOUTH BERWICK: ROUTE 236: Highway Improvements in 2 segments: 1) Reconstruction: Beginning at Main Street and continuing for 0.29 of a mile northerly to the Pan Am RR tracks; 2) Mill & Fill: Beginning at Main Street and continuing 0.15 of a mile southerly to Portland Street. last updated February 26 |