 Roadwork   Text Only
Click or move mouse over icons to get more information
Roadwork Section Affected
single line traffic - alternating directions on Maine 113 from South Intersection with State Route 11 to North Intersection with State Route 113 because the road is being repaved — until tomorrow at about 8:00 PM EDT last updated July 9
single line traffic - alternating directions, temporary traffic lights on US 2 between ME 113 and ME 26; ME 5 due to bridge construction work — until November 18 last updated September 6
bridge construction on Maine 236 between State Route 91 and North Intersection with State Route 236 — until June 10, 2011 last updated June 11
bridge construction on Maine 103 between I-95 and I-95 — until September 30 last updated July 9
construction work, roadway reduced to two lanes, speed restrictions in force on Interstate 95 in both directions from Exit 25 ME 35 to Exit 32 ME 111 — until today at about 5:00 PM EDT last updated yesterday at 11:56 AM EDT
North Arrow
 
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 in both directions: from Exit 25 ME 35 to Exit 32 ME 111
construction work, roadway reduced to two lanes, speed restrictions in force — until today at about 5:00 PM EDT

last updated yesterday at 11:56 AM EDT
 
Roadwork - US 2
US 2: between ME 113 and ME 26; ME 5
single line traffic - alternating directions, temporary traffic lights due to bridge construction work — until November 18
Comment: Route: 2.....Gilead...Highway Reconstruction.....): This project includes removal of the existing bridge spanning over Bog Brook. The project begins 1.38 of a mile easterly of Bridge Street and extending easterly 1.95 miles. This project matches onto another active construction project .Full reconstruction to include clearing, utility pole relocation, rock excavation, drainage improvements, new subbase, new pavement, four precast concrete box culverts and other incidentals Traffic will be reduced to alternating one lane with the use of traffic signals from early/mid July through the end of August in the area of Bog Brook. The contractor will be removing the existing bridge and installing a precast concrete box culvert at Bog Brook .

last updated September 6
 
Roadwork - Maine 103
Maine 103: between I-95 and I-95
bridge construction — until September 30
Comment: Bridge Replacement work

last updated July 9
 
Roadwork - Maine 113
Maine 113: from South Intersection with State Route 11 to North Intersection with State Route 113
single line traffic - alternating directions because the road is being repaved from 07:00am UTC -04:00 to 08:00pm UTC -04:00 on weekdays and Saturdays — until tomorrow at about 8:00 PM EDT
Comment: Audio Text: Town : Baldwin - Hiram..Route :113...Alternating one way Traffic due to paving operations Town : Baldwin - Hiram..Route :113..

last updated July 9
 
Roadwork - Maine 236
Maine 236: between State Route 91 and North Intersection with State Route 236
bridge construction — until June 10, 2011
Comment: Bridge Replacement on Route 236 in South Berwick.

last updated June 11


 