Maine.gov Home State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park
Weather

 Roadwork   Show Map
Roadwork
MAINE
Roadwork - Interstate 95
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike
lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29
Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted.

last updated May 2
 
Roadwork - Interstate 95
Interstate 95: from after Exit 3 US 1 to after Canadian Border
construction work, paving operations — until July 5
Comment:: KITTERY, RAMP M BR #6222..Wearing Surface Replacement to Ramp M US1 / I 95 Ramp bridge # 6222 in Kittery which carries Rte 1 southbound over Rte 1 to I-95 Ramp.

last updated March 28
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Exit 42 Payne Road
road marking operations — starting 7:30 AM, 05/23/13 until Thursday, at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 36 in Saco, north and southbound rolling lane closures are scheduled from 7:30 am to 3 pm for line striping.

last updated yesterday at 12:53 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 3 US 1 to before Cumberland Service Area
street cleaning — until Thursday, at about 3:00 PM EDT
Comment: Between mile 2 in Kittery and mile 53 in Falmouth, north and southbound rolling shoulder closures are scheduled daily from 7:30 am to 3 pm from Monday, May 20 through Thursday, May 23 for sweeping.

last updated yesterday at 12:23 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 7 US 1 to before Exit 19 ME 109
road maintenance operations — until Thursday, at about 6:00 PM EDT
Comment: Between mile 7 in York and mile 14 in Ogunquit, north and southbound lane closures are scheduled daily from 6 am to 6 pm Monday, May 20 through Thursday, May 23 for guardrail and drainage repairs. .

last updated yesterday at 12:26 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from after Exit 7 US 1 to before Exit 19 ME 109
paving operations — until Thursday, at about 3:00 PM EDT
Comment: Between mile 7 in York and mile 14 in Ogunquit, northbound lane closures are scheduled daily from 8 am to 3 pm Tuesday, May 21 through Thursday, May 23 for pavement repair.

last updated yesterday at 12:29 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from after York Toll Plaza to before Exit 25 ME 35
road maintenance operations — until Thursday, at about 6:00 PM EDT
Comment: Between mile 18 and mile 19.5 in Wells, a northbound lane closure is scheduled daily from 6 am to 6 pm Monday, May 20 through Thursday, May 23 for guardrail and drainage repairs. .

last updated yesterday at 12:32 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: from after Exit 32 ME 111 to before Exit 36 I-195
bridge construction — until Thursday, at about 4:00 PM EDT
Comment: Between mile 33 and 32 in Biddeford, a southbound lane closure is scheduled daily from 6 am to 4 pm Monday, May 20 through Thursday, May 23 for bridge work on the Saco River Bridge. .

last updated yesterday at 12:35 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: at Exit 42 Payne Road
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until tomorrow at about 1:00 AM EDT
Comment: On Tuesday, May 21, temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Between the hours of 8 pm and 1 am the Exit 42 northbound departing ramp, and Exit 45 southbound departing ramp will be closed. Between the hours of 1 am and 6 am the Exit 42 southbound departing ramp and the exit 45 northbound departing ramp will be closed. This message will be updated as conditions change. Please drive safely.

last updated today at 12:09 PM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: between Exit 42 Payne Road and Exit 44 I-295
exit ramp closed because the road is being repaved — starting 1:00 AM, 05/22/13 until tomorrow at about 6:00 AM EDT
Comment: On Tuesday, May 21, temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Between the hours of 8 pm and 1 am the Exit 42 northbound departing ramp, and Exit 45 southbound departing ramp will be closed. Between the hours of 1 am and 6 am the Exit 42 southbound departing ramp and the exit 45 northbound departing ramp will be closed. This message will be updated as conditions change. Please drive safely.

last updated today at 12:04 PM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: at Exit 45 Maine Turnpike Approach
exit ramp closed because the road is being repaved — starting 1:00 AM, 05/22/13 until tomorrow at about 6:00 AM EDT
Comment: On Tuesday, May 21, temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Between the hours of 8 pm and 1 am the Exit 42 northbound departing ramp, and Exit 45 southbound departing ramp will be closed. Between the hours of 1 am and 6 am the Exit 42 southbound departing ramp and the exit 45 northbound departing ramp will be closed. This message will be updated as conditions change. Please drive safely.

last updated today at 12:05 PM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: at Exit 45 Maine Turnpike Approach
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until tomorrow at about 1:00 AM EDT
Comment: On Tuesday, May 21, temporary exit closures are scheduled at the Exit 42 Interchange in Scarborough and the Exit 45 Interchange in South Portland between the hours of 8 pm and 6 am for paving. Between the hours of 8 pm and 1 am the Exit 42 northbound departing ramp, and Exit 45 southbound departing ramp will be closed. Between the hours of 1 am and 6 am the Exit 42 southbound departing ramp and the exit 45 northbound departing ramp will be closed. This message will be updated as conditions change. Please drive safely.

last updated today at 12:07 PM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: from after Exit 48 ME 25 to before Cumberland Service Area
bridge construction — until Thursday, at about 3:30 PM EDT
Comment: Between mile 51 in Portland and mile 53 in Falmouth, north and southbound lane closures are scheduled daily from 8:30 am to 3:30 pm Sunday, May 19 through Thursday, May 23 for bridge work on the Exit 52 Interchange Bridge.

last updated yesterday at 12:37 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: at Exit 52 Falmouth Spur
entrance ramp closed, exit ramp closed due to bridge construction work
Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp is expected to reopen on approximately May 24th. The southbound departing ramp will remain closed through October.

last updated today at 12:02 PM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area
intermittent lane closure because of road maintenance activities —
Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection.

last updated March 27
 
Roadwork - Interstate 95
Interstate 95 in both directions: between Exit 80 ME 196 and Lewiston Service Area
bridge construction — until Thursday, at about 3:30 PM EDT
Comment: At mile 70.8 in New Gloucester, north and southbound lane closures are scheduled from 6:30 am to 3:30 pm for bridge work on the Snow Hill Road Bridge Monday May 20 thru Thursday May 23.

last updated yesterday at 12:50 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: at Exit 102 ME 9; ME 126
bridge construction — until Thursday, at about 5:00 PM EDT
Comment: At mile 102 in West Gardiner, a southbound lane closure is scheduled daily from 6:30 am to 5 pm Monday, May 20 through Thursday, May 23 for bridge work. .

last updated yesterday at 12:40 AM EDT
 
Roadwork - Interstate 95
Interstate 95 northbound: from Exit 109 US 202 to Exit 112 ME 8; ME 11; ME 27
alternating lane closures because of bridge maintenance work — until today at about 3:00 PM EDT
Comment: closed for bridge washing

last updated today at 8:59 AM EDT
 
Roadwork - Interstate 95
Interstate 95 southbound: from Exit 127 ME 11; ME 137 to Exit 130 ME 104
right lane closed because of road maintenance activities — until today at about 3:00 PM EDT
Comment: the right lane of I-95 southbound will be closed between miles 128 and 127 for the purpose of guardrail repair until about 3pm

last updated today at 7:10 AM EDT
 
Roadwork - Interstate 95
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road
width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29
Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone.

last updated December 24
 
Roadwork - Interstate 295
Interstate 295 southbound: between Exit 4 US 1 and Exit 5 ME 22
brush control, work on the shoulder —
Comment: 295 mile 5 there will be work on the right hand shoulder due to mowing. Will last until 3am. 8/30/12

last updated August 30
 
Roadwork - Interstate 295
Interstate 295 northbound: at Exit 15 US 1
exit ramp closed, road reconstruction -- detour in operation — until October 24
Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot

last updated April 12
 
Roadwork - Interstate 295
Interstate 295 southbound: from Exit 28 US 1 to Exit 37 ME 125; ME 138
roadside cleanup crew at work, farm equipment — until today at about 4:00 PM EDT
Comment: roadside mowing

last updated today at 8:56 AM EDT
 
Roadwork - US 1A
US 1A: between US 1A Bangor Central Loop and ME 9; ME 15
bridge construction because of bridge maintenance work — until December 20
Comment: Rte 1A in Bangor / Brewer Joshua Chaimberlain Bridge painting bridge

last updated April 20
 
Roadwork - US 1
US 1 in both directions: between ME 35;ME 9A; Summer Street and ME 111; Alfred Road
road construction, single line traffic - alternating directions because of construction work — until June 29
Comment: Rte 1 Biddeford Beginning at Beaudoin Avenue and extending 0.54 of a mile to Grayson Street. will be doing Reconstruction, Construct Shoulders, Sidewalks, Drainage Improvements.Lane closures expected daily. Traffic will be maintained at all times.

last updated September 19
 
Roadwork - US 1
US 1: between ME 9; ME 208; Main Street and ME 112;ME 9
road construction Advisory speed limit 15 MPH from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 30, 2015
Comment: Town: Biddeford...Route: Route 1 (Elm Street...Description: Reconstruction, Construct Shoulders, Sidewalks, Drainage. Lane closures expected daily. Traffic will be maintained at all times.

last updated September 20
 
Roadwork - US 1
US 1: between ME 98; Cascade Road and ME 9; Pine Point Road
road construction — until June 14
Comment: Route: 1/9 Dunstans Corner Description: HMA overlay, lane widening, water main replacement, drainage and safety improvements

last updated September 25
 
Roadwork - US 1
US 1: from after ME 136; Mallet Drive to before I-295
roadway reduced to one lane, paving operations, construction work — until July 31
Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July

last updated May 7
 
Roadwork - US 1
US 1 in both directions: from after ME 127 to before ME 144
bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14

last updated March 15
 
Roadwork - US 1
US 1: between ME 218 and ME 27
bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14
Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane

last updated April 12
 
Roadwork - US 1
US 1: between ME 164; High Street and ME 89; Limestone Road
construction work — starting 7:00 AM, 05/31/13 until October 15
Comment: Route 1 , beginning 0.10 miles north of High Street & extending northerly to a point 405 feet east of the intersection of Route 1 and Route 89..HIGHWAY RESURFACING Starting 5/31/13 ending 10/15/13

last updated May 15
 
Roadwork - US 1
US 1: from after ME 164; High Street to before US 1A
single line traffic - alternating directions, construction work because the road is being repaved — starting 7:00 AM, 05/31/13 until October 15
Comment: WIN 19233.00 is located on Route 1 , beginning at the intersection with Bennett Drive in Caribou, & extending northerly 10.04 miles to Connor TWP, ending 0.47 miles south of Guerrette Road.

last updated May 15
 
Roadwork - US 1
US 1: from after US 1A to before ME 162
single line traffic - alternating directions because the road is being repaved — until Friday, at about 6:00 PM EDT
Comment: Route 1...Madawaska...Route 1 in the town of Madawaska, beginning at the intersection of 3rd Street and extending westerly 1.64 miles, ending 260 feet shy of the Madawaska/Frenchville town line.

last updated May 1
 
Roadwork - US 201
US 201: at ME 148
single line traffic - alternating directions due to road construction work from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays — until July 20
Comment: Rte 201 in Madison Beginning 0.16 of a mile north of Route 148 in Madison to Fall Brook Bridge in Solon. reduced to one lane will be short delays during working hours 6:00 am to 6:00 p.m. Monday - Friday

last updated May 14
 
Roadwork - US 202
US 202: from ME 115; Windham Rd to before I-95 Turnpike
road construction
Comment: Audio Text: Town : Gray - Windham..Route :202-115.Intersection Reconstruction

last updated February 8
 
Roadwork - US 202
US 202: between I-95 Turnpike and ME 11; Minot Avenue
new road construction layout — until May 31
Comment: Town Auburn..Sign Installation.

last updated April 12
 
Roadwork - US 302
US 302: from after State Route 117 to State Route 35
single line traffic - alternating directions, delays because the road is being repaved — until Friday, at about 7:00 PM EDT
Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area

last updated May 10
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic
Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect.

last updated April 13
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
width limit in effect due to bridge construction work -- affecting, westbound traffic
Comment: Effective Monday, April 16, 2012, because of bridge work on the Falmouth Spur, there will be a restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to enter the Maine Turnpike from the Falmouth Spur . This restriction only affects vehicles traveling westbound on the Falmouth Spur. Eastbound traffic departing the Maine turnpike is not affected. This restriction will remain in effect until further notice.

last updated April 9


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster