| Major Delays |
| Roadwork - US 1A |
US 1A: from Red Bridge Road to before ME 179; ME 180 road construction, delays of uncertain duration due to road construction work — until May 31, 2011 Comment: Ellsworth. Construction work on Route 1A Ellsworth from just north of Rte 180 toRed Bridge Road. Expect daytime delays. last updated July 29 |
| | | Roadwork - Maine 7 |
Maine 7: between US 2; State Route 11 and State Route 43; Albans Road single line traffic - alternating directions, delays of uncertain duration because of bridge maintenance work — until September 20 Comment: There will be alternating one way traffic controlled by temporary traffic signals through a bridge maintenance work zone on Rte 7 at the Mulligan Stream Bridge in Newport. last updated August 26 |
|