| Major Delays |
| Posted Roads - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| | | Closure - Interstate 95 |
Interstate 95 northbound: from after Exit 120 Lyons Road to before Exit 127 ME 11; ME 137 roadway reduced to one lane because of road maintenance activities — for the next hour Comment: 95 north Oakland mile 124 to 125.5 reduced to one lane fixing guardrail. last updated today at 9:47 AM EDT |
|