| Major Delays |
| Posted Roads - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| |
| Posted Roads - Maine 9 |
Maine 9: between US 1; Blue Star Memorial Highway and State Route 35; Port Road width limit in effect, roadway reduced to one lane due to bridge construction work Width limit 10 ' 0 " — until November 29 Comment: Town: Kennebunk::Clay Hill Bridge over the Mousam River..Bridge Replacement .The project will have a 1 lane temporary bridge NO WIDE LOADS OVER 10 FEET WIDE. last updated November 2 |
| |
| Posted Roads - Maine 16 |
Maine 16: between State Route 6; State Route 155 and I-95 width limit in effect, temporary traffic lights, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 " — until November 15 Comment: Rte 16 LaGrange Lane Closure:Bridge Replacement alternating one-way with traffic signal on 12 0 wide on site detour. Delay: Up to 5 minutes due to alternating one way traffic Restriction: 12 0 one lane bridge posted at 25 MPH currently scheduled to occur from 05/06/2013 until 08/15/2013. last updated May 8 |
| |
| Roadwork - US 302 |
US 302: from after State Route 117 to State Route 35 single line traffic - alternating directions, delays because the road is being repaved — until Friday, at about 7:00 PM EDT Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area last updated May 10 |
| |
| Roadwork - Maine 3 |
Maine 3: from after State Route 230; Oak Point Road to before State Route 233; Eagle Lake Road single line traffic - alternating directions, delays of uncertain duration because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — until June 28 Comment: Trenton Paving to Begin,,Route 3 construction has resumed and paving is scheduled to start Monday, May 13th ..The project included reconstruction of one-tenth of a mile of Route 230 and six-tenths of a mile of Route 3 in Trenton. To improve safety and traffic flow, the intersection of Route 230 and Route 3 have been redesigned to include a new traffic signal and turning lanes...the current schedule indicates a late June completion. Motorists may experience delays and are encouraged to allow extra travel time. last updated May 9 |
| |
| Roadwork - Maine 102 |
Maine 102: at State Route 198 temporary traffic lights, roadway reduced to one lane because of bridge maintenance work — until Friday, at about 5:00 PM EDT Comment: Bar Harbor - MaineDOT crews begin work on the Babsons Bridge in Bar Harbor this week. This project begins at the intersection of Route 102 and extends east on Route 198 for approximately 1,500 ft. Temporary traffic lights will be on scene to assist in alternating one-way traffic through the work zone during daytime hours. Both lanes of travel will be open during the evening and overnight. This work includes sealing the surface deck to maintain the service life of this bridge. It is anticipated the project will be completed by the middle of May. last updated April 1 |
| |
| Roadwork - Maine 179 |
Maine 179: between US Route 1A; Bangor Road and State Route 180 construction work, roadway reduced to one lane due to road work — until November 7 Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation last updated August 31 |
| |
| Roadwork |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect. last updated April 13 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29 Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted. last updated May 2 |
| |
| Closure - Interstate 95 |
Interstate 95 in both directions: at Exit 42 Payne Road entrance ramp closed, exit ramp closed because the road is being repaved — until today at about 6:00 AM EDT Comment: The Exit 42 northbound entering ramp, southbound entering ramp, and northbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Tuesday, May 21st for pavement repairs. last updated May 18 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: at Exit 42 Payne Road entrance ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT Comment: The Exit 42 northbound entering ramp in Scarborough will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs. last updated May 18 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: between Exit 42 Payne Road and Exit 44 I-295 exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until tomorrow at about 6:00 AM EDT Comment: The Exit 42 southbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs. last updated May 18 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: at Exit 45 Maine Turnpike Approach exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until tomorrow at about 6:00 AM EDT Comment: The Exit 45 northbound departing ramp in South Portland will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs. last updated May 18 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: at Exit 45 Maine Turnpike Approach exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until Thursday, at about 6:00 AM EDT Comment: The Exit 45 southbound departing ramp in South Portland will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs. last updated May 18 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur entrance ramp closed, exit ramp closed due to bridge construction work Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp will re-open in approximately 7 days. The southbound departing ramp will remain closed through October. last updated May 11 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area intermittent lane closure because of road maintenance activities — Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection. last updated March 27 |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: at New Hampshire State Line bridge closed No vehicles over 60000 lbs — until June 30, 2014 Comment: Rte 1 in Kittery Memorial bridge CLOSED ..permanently to Vehicle traffic. New bridge under construction ..Alternative routes for vehicle crossing between New Hampshire and Maine include the Sarah Mildred Long Bridge and I-95 high level Bridge last updated July 11 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Closure - Maine 9 |
Maine 9: between State Route 193 and State Route 192 road open to traffic due to an earlier crash — Comment: Rte 9 in Beddington is open sending traffic around accident. last updated December 10 |
| |
| Closure - Maine 136 |
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30 Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization last updated April 30 |
| |
| Closure - Maine 224 |
Maine 224: from State Route 109 to after State Route 109 road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford. last updated May 13 |
| |
| Closure |
Boundary Line Road in Bridgewater: after US 1 roadway reduced to one lane because of bridge maintenance work Comment: Bridgewater the Tannery Road bridge reduced to one lane till further notice last updated May 14 |
| |
| Closure |
Pond Road in Manchester: between End of Route and US 202; Western Avenue;State Route 11 road closed for repairs — starting 7:00 AM, 05/21/13 until Friday, at about 4:00 PM EDT Comment: Manchester Road Closure..Manchester Two cross culverts in Manchester will be replaced starting on May 21st resulting in a road closure beginning at the intersection of the Collins Road and Pond Road. Variable message boards along with additional signage will guide travelers through the 5 mile detour route from the Pond and Collins Road to Benson Road to Hallowell-Litchfield Road to Collins Mills Road to the Neck Road. The detour will be in effect from May 21st until May 24th. last updated May 14 |
| |
| Closure |
Stow Road in Fryeburg: from after End of Route to after End of Route bridge closed -- follow the detour signs Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD. last updated April 2 |