| Major Delays |
| Posted Roads - Maine 9 |
Maine 9: between US 1; Blue Star Memorial Highway and State Route 35; Port Road width limit in effect, roadway reduced to one lane due to bridge construction work Width limit 10 ' 0 " — until November 29 Comment: Town: Kennebunk::Clay Hill Bridge over the Mousam River..Bridge Replacement .The project will have a 1 lane temporary bridge NO WIDE LOADS OVER 10 FEET WIDE. last updated November 2 |
| |
| Roadwork - US 302 |
US 302: from after State Route 117 to State Route 35 single line traffic - alternating directions, delays because the road is being repaved — until May 24 Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area last updated May 10 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29 Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted. last updated May 2 |
| |
| Closure - US 1 |
US 1: at New Hampshire State Line bridge closed No vehicles over 60000 lbs — until June 30, 2014 Comment: Rte 1 in Kittery Memorial bridge CLOSED ..permanently to Vehicle traffic. New bridge under construction ..Alternative routes for vehicle crossing between New Hampshire and Maine include the Sarah Mildred Long Bridge and I-95 high level Bridge last updated July 11 |
| |
| Closure - Maine 224 |
Maine 224: from State Route 109 to after State Route 109 road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford. last updated May 13 |
| |
| Closure |
Stow Road in Fryeburg: from after End of Route to after End of Route bridge closed -- follow the detour signs Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD. last updated April 2 |