Click or move mouse over icons to get more information
Accident Alert Roadwork Closure Lane Closed Section Affected
bridge closed on US 1 at New Hampshire State Line — until June 30, 2014 last updated July 11 roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights on Maine 136 from after State Route 9; Swap Road to before I-495; Maine Turnpike because there is work on the shoulder — until September 30 last updated April 30 road closed on Maine 224 from State Route 109 to after State Route 109 because of construction work — until June 28 last updated May 13 bridge closed on Stow Road in Fryeburg from after End of Route to after End of Route -- follow the detour signs last updated April 2 roadway reduced to one lane, paving operations, construction work on US 1 from after ME 136; Mallet Drive to before I-295 — until July 31 last updated May 7 exit ramp closed, road reconstruction on Interstate 295 northbound at Exit 15 US 1 -- detour in operation — until October 24 last updated April 12 entrance ramp closed on Interstate 95 northbound between Exit 112 ME 8; ME 11; ME 27 and Exit 120 Lyons Road due to road construction work — until Monday, at about 11:59 PM EDT last updated April 19 entrance ramp closed, exit ramp closed on Interstate 95 southbound at Exit 52 Falmouth Spur due to bridge construction work last updated May 11 road closed for repairs on Pond Road in Manchester between End of Route and US 202; Western Avenue;State Route 11 — starting 7:00 AM, 05/21/13 until May 24 last updated May 14 roadway reduced to one lane on Boundary Line Road in Bridgewater after US 1 because of bridge maintenance work last updated May 14 exit ramp closed on Interstate 95 in both directions at Exit 42 Payne Road because the road is being repaved — starting 8:00 PM, 05/19/13 until Monday, at about 6:00 AM EDT last updated today at 2:32 PM EDT entrance ramp closed, exit ramp closed on Interstate 95 in both directions at Exit 42 Payne Road because the road is being repaved — starting 8:00 PM, 05/20/13 until Tuesday, at about 6:00 AM EDT last updated today at 2:44 PM EDT exit ramp closed on Interstate 95 southbound between Exit 42 Payne Road and Exit 44 I-295 because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT last updated today at 2:56 PM EDT exit ramp closed on Interstate 95 northbound at Exit 45 Maine Turnpike Approach because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT last updated today at 3:05 PM EDT entrance ramp closed on Interstate 95 northbound at Exit 42 Payne Road because the road is being repaved — starting 8:00 PM, 05/22/13 until May 23 last updated today at 3:09 PM EDT exit ramp closed on Interstate 95 southbound at Exit 45 Maine Turnpike Approach because the road is being repaved — starting 8:00 PM, 05/22/13 until May 23 last updated today at 3:11 PM EDT single line traffic - alternating directions, delays of uncertain duration on Maine 3 from after State Route 230; Oak Point Road to before State Route 233; Eagle Lake Road because the road is being repaved — until June 28 last updated May 9 single line traffic - alternating directions, delays on US 302 from after State Route 117 to State Route 35 because the road is being repaved — until May 24 last updated May 10 width limit in effect, temporary traffic lights, roadway reduced to one lane on Maine 16 between State Route 6; State Route 155 and I-95 because of bridge maintenance work — until November 15 last updated May 8 construction work, roadway reduced to one lane on Maine 179 between US Route 1A; Bangor Road and State Route 180 due to road work — until November 7 last updated August 31 width limit in effect, roadway reduced to one lane on Maine 9 between US 1; Blue Star Memorial Highway and State Route 35; Port Road due to bridge construction work — until November 29 last updated November 2 intermittent lane closure on Interstate 95 northbound from Exit 53 ME 26; ME 100 to Gray Service Area because of road maintenance activities — last updated March 27 lane closed on Interstate 95 southbound from after New Hampshire State Line to Start of Maine Turnpike because the road is being repaved — until June 29 last updated May 2 bridge construction, roadway reduced to one lane, speed restrictions in force on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza -- affecting, eastbound traffic, westbound traffic last updated April 13 width limit in effect, roadway reduced to one lane on Interstate 95 in both directions between Exit 133 US 201 and Exit 138 Hinckley Road because of bridge maintenance work — until November 29 last updated December 24 temporary traffic lights, roadway reduced to one lane on Maine 102 at State Route 198 because of bridge maintenance work — until May 24 last updated April 1 road open to traffic on Maine 9 between State Route 193 and State Route 192 due to an earlier crash — last updated December 10
North Arrow
 
Major Delays
MAINE
Posted Roads - Interstate 95
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road
width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29
Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone.

last updated December 24
 
Posted Roads - Maine 9
Maine 9: between US 1; Blue Star Memorial Highway and State Route 35; Port Road
width limit in effect, roadway reduced to one lane due to bridge construction work Width limit 10 ' 0 " — until November 29
Comment: Town: Kennebunk::Clay Hill Bridge over the Mousam River..Bridge Replacement .The project will have a 1 lane temporary bridge NO WIDE LOADS OVER 10 FEET WIDE.

last updated November 2
 
Posted Roads - Maine 16
Maine 16: between State Route 6; State Route 155 and I-95
width limit in effect, temporary traffic lights, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 " — until November 15
Comment: Rte 16 LaGrange Lane Closure:Bridge Replacement alternating one-way with traffic signal on 12 0 wide on site detour. Delay: Up to 5 minutes due to alternating one way traffic Restriction: 12 0 one lane bridge posted at 25 MPH currently scheduled to occur from 05/06/2013 until 08/15/2013.

last updated May 8
 
Roadwork - US 302
US 302: from after State Route 117 to State Route 35
single line traffic - alternating directions, delays because the road is being repaved — until May 24
Comment: Naples - A paving project will begin in Napes along the Causeway beginning Monday, May 13th...Alternating one-way traffic will occur from the Route 35 intersection, continuing along the Causeway, ending at the Naples Town Office. The hours of operation will be from 7 a.m. through 7 p.m. each day through the duration of the project. Motorists should expect major delays, and allow extra travel time through this area

last updated May 10
 
Roadwork - Maine 3
Maine 3: from after State Route 230; Oak Point Road to before State Route 233; Eagle Lake Road
single line traffic - alternating directions, delays of uncertain duration because the road is being repaved Advisory speed limit 15 MPH from 06:00am UTC -04:00 to 06:00pm UTC -04:00 on weekdays and Saturdays — until June 28
Comment: Trenton Paving to Begin,,Route 3 construction has resumed and paving is scheduled to start Monday, May 13th ..The project included reconstruction of one-tenth of a mile of Route 230 and six-tenths of a mile of Route 3 in Trenton. To improve safety and traffic flow, the intersection of Route 230 and Route 3 have been redesigned to include a new traffic signal and turning lanes...the current schedule indicates a late June completion. Motorists may experience delays and are encouraged to allow extra travel time.

last updated May 9
 
Roadwork - Maine 102
Maine 102: at State Route 198
temporary traffic lights, roadway reduced to one lane because of bridge maintenance work — until May 24
Comment: Bar Harbor - MaineDOT crews begin work on the Babsons Bridge in Bar Harbor this week. This project begins at the intersection of Route 102 and extends east on Route 198 for approximately 1,500 ft. Temporary traffic lights will be on scene to assist in alternating one-way traffic through the work zone during daytime hours. Both lanes of travel will be open during the evening and overnight. This work includes sealing the surface deck to maintain the service life of this bridge. It is anticipated the project will be completed by the middle of May.

last updated April 1
 
Roadwork - Maine 179
Maine 179: between US Route 1A; Bangor Road and State Route 180
construction work, roadway reduced to one lane due to road work — until November 7
Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation

last updated August 31
 
Roadwork
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic
Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect.

last updated April 13
 
Closure - Interstate 95
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike
lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29
Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted.

last updated May 2
 
Closure - Interstate 95
Interstate 95 in both directions: at Exit 42 Payne Road
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/19/13 until Monday, at about 6:00 AM EDT
Comment: The Exit 42 north and southbound departing ramps in Scarborough will be closed for pavement repairs from 8 pm to 6 am on Monday, May 20th.

last updated today at 2:32 PM EDT
 
Closure - Interstate 95
Interstate 95 in both directions: at Exit 42 Payne Road
entrance ramp closed, exit ramp closed because the road is being repaved — starting 8:00 PM, 05/20/13 until Tuesday, at about 6:00 AM EDT
Comment: The Exit 42 northbound entering ramp, southbound entering ramp, and northbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Tuesday, May 21st for pavement repairs.

last updated today at 2:44 PM EDT
 
Closure - Interstate 95
Interstate 95 northbound: at Exit 42 Payne Road
entrance ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until May 23
Comment: The Exit 42 northbound entering ramp in Scarborough will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs.

last updated today at 3:09 PM EDT
 
Closure - Interstate 95
Interstate 95 southbound: between Exit 42 Payne Road and Exit 44 I-295
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT
Comment: The Exit 42 southbound departing ramp in Scarborough will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs.

last updated today at 2:56 PM EDT
 
Closure - Interstate 95
Interstate 95 northbound: at Exit 45 Maine Turnpike Approach
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/21/13 until Wednesday, at about 6:00 AM EDT
Comment: The Exit 45 northbound departing ramp in South Portland will be closed from 8 pm to 6 am on Wednesday, May 22nd for pavement repairs.

last updated today at 3:05 PM EDT
 
Closure - Interstate 95
Interstate 95 southbound: at Exit 45 Maine Turnpike Approach
exit ramp closed because the road is being repaved — starting 8:00 PM, 05/22/13 until May 23
Comment: The Exit 45 southbound departing ramp in South Portland will be closed from 8 pm to 6 am on Thursday, May 23rd for pavement repairs.

last updated today at 3:11 PM EDT
 
Closure - Interstate 95
Interstate 95 southbound: at Exit 52 Falmouth Spur
entrance ramp closed, exit ramp closed due to bridge construction work
Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp will re-open in approximately 7 days. The southbound departing ramp will remain closed through October.

last updated May 11
 
Closure - Interstate 95
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area
intermittent lane closure because of road maintenance activities —
Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection.

last updated March 27
 
Closure - Interstate 95
Interstate 95 northbound: between Exit 112 ME 8; ME 11; ME 27 and Exit 120 Lyons Road
entrance ramp closed due to road construction work — until Monday, at about 11:59 PM EDT
Comment: 95 northbound on ramp closed due to road improvement During the closure, detour signs will guide northbound motorists along Route 104 to Exit 120 in Sidney. MaineDOT encourages drivers to plan ahead and allow extra time for travel.

last updated April 19
 
Closure - Interstate 295
Interstate 295 northbound: at Exit 15 US 1
exit ramp closed, road reconstruction -- detour in operation — until October 24
Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot

last updated April 12
 
Closure - US 1
US 1: at New Hampshire State Line
bridge closed No vehicles over 60000 lbs — until June 30, 2014
Comment: Rte 1 in Kittery Memorial bridge CLOSED ..permanently to Vehicle traffic. New bridge under construction ..Alternative routes for vehicle crossing between New Hampshire and Maine include the Sarah Mildred Long Bridge and I-95 high level Bridge

last updated July 11
 
Closure - US 1
US 1: from after ME 136; Mallet Drive to before I-295
roadway reduced to one lane, paving operations, construction work — until July 31
Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July

last updated May 7
 
Closure - Maine 9
Maine 9: between State Route 193 and State Route 192
road open to traffic due to an earlier crash —
Comment: Rte 9 in Beddington is open sending traffic around accident.

last updated December 10
 
Closure - Maine 136
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike
roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30
Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization

last updated April 30
 
Closure - Maine 224
Maine 224: from State Route 109 to after State Route 109
road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28
Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford.

last updated May 13
 
Closure
Boundary Line Road in Bridgewater: after US 1
roadway reduced to one lane because of bridge maintenance work
Comment: Bridgewater the Tannery Road bridge reduced to one lane till further notice

last updated May 14
 
Closure
Pond Road in Manchester: between End of Route and US 202; Western Avenue;State Route 11
road closed for repairs — starting 7:00 AM, 05/21/13 until May 24
Comment: Manchester Road Closure..Manchester Two cross culverts in Manchester will be replaced starting on May 21st resulting in a road closure beginning at the intersection of the Collins Road and Pond Road. Variable message boards along with additional signage will guide travelers through the 5 mile detour route from the Pond and Collins Road to Benson Road to Hallowell-Litchfield Road to Collins Mills Road to the Neck Road. The detour will be in effect from May 21st until May 24th.

last updated May 14
 
Closure
Stow Road in Fryeburg: from after End of Route to after End of Route
bridge closed -- follow the detour signs
Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD.

last updated April 2


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster