| Commercial Vehicles |
| Posted Roads - US 1 |
US 1 in both directions: from after ME 127 to before ME 144 bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14 last updated March 15 |
| |
| Posted Roads - US 1 |
US 1: between ME 218 and ME 27 bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14 Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane last updated April 12 |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Closure - Maine 136 |
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30 Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization last updated April 30 |