| Commercial Vehicles |
| Posted Roads - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| |
| Posted Roads - Maine 16 |
Maine 16: between State Route 6; State Route 155 and I-95 width limit in effect, temporary traffic lights, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 " — until November 15 Comment: Rte 16 LaGrange Lane Closure:Bridge Replacement alternating one-way with traffic signal on 12 0 wide on site detour. Delay: Up to 5 minutes due to alternating one way traffic Restriction: 12 0 one lane bridge posted at 25 MPH currently scheduled to occur from 05/06/2013 until 08/15/2013. last updated May 8 |
| |
| Posted Roads - Maine 16 |
Maine 16: between State Route 6; State Route 155 and I-95 bridge maintenance operations, width limit in effect Width limit 12 ' 0 " — until October 18 Comment: Town: Old Town ..Route: 16 over I-95 ..Deck Replacement. last updated April 16 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: from Exit 127 ME 11; ME 137 to Exit 130 ME 104 right lane closed because of road maintenance activities — until today at about 3:00 PM EDT Comment: the right lane of I-95 southbound will be closed between miles 128 and 127 for the purpose of guardrail repair until about 3pm last updated today at 7:10 AM EDT |
| |
| Closure - Maine 9 |
Maine 9 in both directions: between State Route 178 and State Route 46; Holden Road road closed intermittently because of bridge maintenance work — starting 12:00 PM, 05/21/13 until today at about 6:00 PM EDT Comment: Eddington -While work continues on the Mill Stream Bridge in Eddington, crews will be conducting a load test during the afternoon of Tuesday, May 21st. All traffic will be stopped for a period of up to five minutes during each individual test. Six tests will take place throughout the afternoon. Motorists are advised to use caution and to allow extra travel time. last updated today at 8:48 AM EDT |
| |
| Closure - Maine 9 |
Maine 9: between State Route 193 and State Route 192 road open to traffic due to an earlier crash — Comment: Rte 9 in Beddington is open sending traffic around accident. last updated December 10 |
| |
| Closure - Maine 179 |
Maine 179: between US Route 1A; Bangor Road and State Route 180 construction work, roadway reduced to one lane due to road work — until November 7 Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation last updated August 31 |