Maine.gov Home State Agencies | Web Policies | My Maine.gov | Email this page
 
All Advisories Major Delays Roadwork Road Conditions Commercial Vehicles

511
 
Explore Maine
Cameras
Site Map
Maine DOT
Maine Tourism
Maine Turnpike
Acadia National Park
Weather

 Commercial Vehicles   Text Only
Click or move mouse over icons to get more information
 Posted State Roads
 Click Here
Closure Lane Closed Section Affected
South Central South Central Capital/Mid-Coast
Southern Maine
roadway reduced to one lane, paving operations, construction work on US 1 from after ME 136; Mallet Drive to before I-295 — until July 31 last updated May 7 exit ramp closed, road reconstruction on Interstate 295 northbound at Exit 15 US 1 -- detour in operation — until October 24 last updated April 12 entrance ramp closed, exit ramp closed on Interstate 95 southbound at Exit 52 Falmouth Spur due to bridge construction work last updated yesterday at 12:02 PM EDT width limit in effect on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza due to bridge construction work -- affecting, westbound traffic last updated April 9 intermittent lane closure on Interstate 95 northbound from Exit 53 ME 26; ME 100 to Gray Service Area because of road maintenance activities — last updated March 27 bridge construction, roadway reduced to one lane, speed restrictions in force on Falmouth Spur between I-95 Turnpike and Falmouth Toll Plaza -- affecting, eastbound traffic, westbound traffic last updated April 13 width limit in effect on Interstate 95 southbound at Exit 52 Falmouth Spur last updated March 22 width limit in effect on Cumberland Street in Westbrook at End of Route due to bridge construction work — until December 1 last updated April 3 width limit in effect on Interstate 95 southbound at Exit 63 US 202 — starting 12:00 AM, 06/12/13 until June 17 last updated yesterday at 1:20 PM EDT
Capital/Mid-Coast
Southern Maine Southern Maine
North Arrow



  For PDF map information on Posted State Roads and Future Posted State Roads for this season, by County.
CLICK HERE
 
Commercial Vehicles
MAINE
Posted Roads - Interstate 95
Interstate 95 southbound: at Exit 52 Falmouth Spur
width limit in effect
Comment: Due to bridge work at the Exit 52 Interchange Bridge in Falmouth, there will be a restriction for wide loads over 10' wide on the Maine Turnpike on the Exit 52 southbound departing ramp in Falmouth until further notice.

last updated March 22
 
Posted Roads - Interstate 95
Interstate 95 southbound: at Exit 63 US 202
width limit in effect — starting 12:00 AM, 06/12/13 until June 17
Comment: Effective Wednesday, June 12, 2013, because of toll plaza work at the Exit 63 Interchange in Gray, there will be a width restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to Enter for Southbound travel at Exit 63 . This restriction will remain in effect until 6 am on Monday, June 17, 2013.

last updated yesterday at 1:20 PM EDT
 
Posted Roads
Cumberland Street in Westbrook: at End of Route
width limit in effect due to bridge construction work Width limit 11 ' 0 " — until December 1
Comment: Westbrook Cumberland St replacing the Cumberland Mills Bridge over the Presumpscot River .27 of a mile northerly of Main St.Two Lane Temporary Bridge opening 5/08/12.This bridge is not designed for tractor trailer trucks. All truck traffic should use designated truck detour route Rt 25 Warren Ave Forest Ave.E. Bridge St.Cumberland St Restrictions Effective 4/6/12 road width will be restricted to 11 lanes during the day and will have Lane Closures at night for Utility Work. This restriction until Mid July.

last updated April 3
 
Posted Roads
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
width limit in effect due to bridge construction work -- affecting, westbound traffic
Comment: Effective Monday, April 16, 2012, because of bridge work on the Falmouth Spur, there will be a restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to enter the Maine Turnpike from the Falmouth Spur . This restriction only affects vehicles traveling westbound on the Falmouth Spur. Eastbound traffic departing the Maine turnpike is not affected. This restriction will remain in effect until further notice.

last updated April 9
 
Closure - Interstate 95
Interstate 95 southbound: at Exit 52 Falmouth Spur
entrance ramp closed, exit ramp closed due to bridge construction work
Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing and entering ramps will be closed to all traffic beginning on Tuesday, May 14. The southbound entering ramp is expected to reopen on approximately May 24th. The southbound departing ramp will remain closed through October.

last updated yesterday at 12:02 PM EDT
 
Closure - Interstate 95
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area
intermittent lane closure because of road maintenance activities —
Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection.

last updated March 27
 
Closure - Interstate 295
Interstate 295 northbound: at Exit 15 US 1
exit ramp closed, road reconstruction -- detour in operation — until October 24
Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot

last updated April 12
 
Closure - US 1
US 1: from after ME 136; Mallet Drive to before I-295
roadway reduced to one lane, paving operations, construction work — until July 31
Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July

last updated May 7
 
Closure
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza
bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic
Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect.

last updated April 13


 

©2008 Maine Department of Transportation

Maine Department of Transportation
16 Statehouse Station
Augusta, ME 04333
 
About 511 | DOT News | Privacy | Accessibility | Email Webmaster