| Commercial Vehicles |
| Posted Roads - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur width limit in effect Comment: Due to bridge work at the Exit 52 Interchange Bridge in Falmouth, there will be a restriction for wide loads over 10' wide on the Maine Turnpike on the Exit 52 southbound departing ramp in Falmouth until further notice. last updated March 22 |
| |
| Posted Roads - Interstate 95 |
Interstate 95 southbound: at Exit 63 US 202 width limit in effect — starting 12:00 AM, 06/12/13 until June 17 Comment: Effective Wednesday, June 12, 2013, because of toll plaza work at the Exit 63 Interchange in Gray, there will be a width restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to Enter for Southbound travel at Exit 63 . This restriction will remain in effect until 6 am on Monday, June 17, 2013. last updated May 21 |
| |
| Posted Roads - Interstate 95 |
Interstate 95 in both directions: between Exit 133 US 201 and Exit 138 Hinckley Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 ", Speed limit 50 MPH — until November 29 Comment: 1-95 Fairfield and Benton.Exit 133 Northbound On-Ramp in Fairfield, ME will be temporarily closed. There will also be a 12 foot maximum vehicle width through the construction zone for the bridge repair work at mile marker 133 on I-95. Northbound wide loads must exit at Exit 132 and Southbound wide loads at Exit 138. The closures and restrictions are scheduled to start on 12/8/2011 and normal traffic patterns are scheduled to be restored in October 2013. Please use caution throughout the construction zone. last updated December 24 |
| |
| Posted Roads - Interstate 95 |
Interstate 95 southbound: between Exit 174 ME 69 and Exit 180 Cold Brook Road width limit in effect, roadway reduced to one lane because of bridge maintenance work Width limit 14 ' 0 " — until July 26 Comment: 95 South in Hermon mile 176 reduced to one lane 14 feet wide due to bridge painting the Newburgh Rd over pass last updated May 29 |
| |
| Posted Roads - US 1A |
US 1A: at New Hampshire State Border gross weight limit in effect No vehicles over 40000 lbs Comment: Kittery / Portsmouth. Weight Restriction on the Sarah Long Bridge on Route 1A. No vehicles over 20 Ton will be allowed on the bridge. last updated December 14 |
| |
| Posted Roads - US 1 |
US 1 in both directions: from after ME 127 to before ME 144 bridge construction, width limit in effect Width limit 10 ' 5 " — until June 14 last updated March 15 |
| |
| Posted Roads - US 1 |
US 1: between ME 218 and ME 27 bridge construction, width limit in effect Width limit 11 ' 6 " — until June 14 Comment: Town: Wiscasset / Edgecomb..Bridge Deck Rehab.. RESTRICTIONS: For duration of the project the roadway will be restricted to two 11 foot travel lanes. There will be periodic Night Time lane closures with alternating traffic on one 11 foot lane last updated April 12 |
| |
| Posted Roads - Maine 9 |
Maine 9: between US 1; Blue Star Memorial Highway and State Route 35; Port Road width limit in effect, roadway reduced to one lane due to bridge construction work Width limit 10 ' 0 " — until November 29 Comment: Town: Kennebunk::Clay Hill Bridge over the Mousam River..Bridge Replacement .The project will have a 1 lane temporary bridge NO WIDE LOADS OVER 10 FEET WIDE. last updated November 2 |
| |
| Posted Roads - Maine 16 |
Maine 16: between State Route 6; State Route 155 and I-95 width limit in effect, temporary traffic lights, roadway reduced to one lane because of bridge maintenance work Width limit 12 ' 0 " — until November 15 Comment: Rte 16 LaGrange Lane Closure:Bridge Replacement alternating one-way with traffic signal on 12 0 wide on site detour. Delay: Up to 5 minutes due to alternating one way traffic Restriction: 12 0 one lane bridge posted at 25 MPH currently scheduled to occur from 05/06/2013 until 08/15/2013. last updated May 8 |
| |
| Posted Roads - Maine 16 |
Maine 16: between State Route 6; State Route 155 and I-95 bridge maintenance operations, width limit in effect Width limit 12 ' 0 " — until October 18 Comment: Town: Old Town ..Route: 16 over I-95 ..Deck Replacement. last updated April 16 |
| |
| Posted Roads |
Cumberland Street in Westbrook: at End of Route width limit in effect due to bridge construction work Width limit 11 ' 0 " — until December 1 Comment: Westbrook Cumberland St replacing the Cumberland Mills Bridge over the Presumpscot River .27 of a mile northerly of Main St.Two Lane Temporary Bridge opening 5/08/12.This bridge is not designed for tractor trailer trucks. All truck traffic should use designated truck detour route Rt 25 Warren Ave Forest Ave.E. Bridge St.Cumberland St Restrictions Effective 4/6/12 road width will be restricted to 11 lanes during the day and will have Lane Closures at night for Utility Work. This restriction until Mid July. last updated April 3 |
| |
| Posted Roads |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza width limit in effect due to bridge construction work -- affecting, westbound traffic Comment: Effective Monday, April 16, 2012, because of bridge work on the Falmouth Spur, there will be a restriction for wide loads on the Maine Turnpike as follows: Such vehicles and loads will not be permitted to enter the Maine Turnpike from the Falmouth Spur . This restriction only affects vehicles traveling westbound on the Falmouth Spur. Eastbound traffic departing the Maine turnpike is not affected. This restriction will remain in effect until further notice. last updated April 9 |
| |
| Posted Roads |
Local road in York: between US 1; York Street and Carwin Drive gross weight limit in effect Axle weight limit 6000 lbs — until October 31 Comment: York -Sewalls Bridge over the York River Bridge Replacement Project. The project will start the week of October 1st. The bridge will be closed in mid October for a one year period. A signed detour route will be posted for vehicular traffic. last updated September 17 |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: from after New Hampshire State Line to Start of Maine Turnpike lane closed because the road is being repaved from 06:00pm UTC -04:00 to 06:00am UTC -04:00 on Saturdays — until June 29 Comment: KITTERY, RTE I-95 ..mile 2.24 southbound Mill/Fill on I-95 including on/off ramps w/ guardrail/drainage improvements: Beginning approx. 200 feet north of the Spruce Creek Bridge southerly to the Piscataqua River Bridge. Night lane closures, Sunday night through Friday morning on northbound lanes. Night lane closures, Monday night through Saturday morning southbound lanes. Ramp closures for all Exits will be advertised and posted. Public will be informed 72 hours prior to closure. Message boards will alert travelers of work being conducted. last updated May 31 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: at Exit 7 US 1 entrance ramp closed, exit ramp closed because the road is being repaved — starting 7:00 PM, 06/06/13 until Friday, at about 6:00 AM EDT Comment: At Exit 7 in York, the northbound entering and departing ramps will be closed intermittently between the hours of 7 pm and 6 am for paving. last updated today at 2:49 PM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 in both directions: from Exit 7 US 1 to Exit 19 ME 109 lane closed because the road is being repaved — until Friday, at about 6:00 AM EDT Comment: Between mile 7 in York and mile 14 in Ogunquit, north and southbound lane closures are scheduled daily from 8 pm to 6 am Sunday, June 2; and from 6 pm to 6 am Monday, June 3 through Thursday, June 6 for milling and paving. last updated yesterday at 5:49 PM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: between Exit 7 US 1 and York Toll Plaza exit ramp closed, entrance ramp closed because the road is being repaved — starting 7:00 PM, 06/05/13 until Thursday, at about 6:00 AM EDT Comment: At Exit 7 in York, the southbound entering and departing ramps will be closed intermittently between the hours of 7 pm and 6 am for paving. last updated today at 2:48 PM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 in both directions: at Exit 42 Payne Road exit ramp closed, entrance ramp closed because the road is being repaved — starting 8:00 PM, 06/03/13 until tomorrow at about 6:00 AM EDT Comment: At Exit 42 in Scarborough, the north and southbound departing ramps, and the southbound entering ramp will be closed intermittently between the hours of 8 pm and 6 am for paving. Motorists should observe posted variable message boards for the most up to date closure information. last updated yesterday at 10:33 PM EDT |
| |
| Closure - Interstate 95 |
Interstate 95 southbound: at Exit 52 Falmouth Spur exit ramp closed due to bridge construction work Comment: Due to construction on the Exit 52 Interchange Bridge, the Exit 52 southbound departing ramp will be closed to all traffic. The ramp will remain closed through October. last updated May 24 |
| |
| Closure - Interstate 95 |
Interstate 95 northbound: from Exit 53 ME 26; ME 100 to Gray Service Area intermittent lane closure because of road maintenance activities — Comment: At mile 57 in Cumberland, a northbound mobile lane closure is scheduled from 9 am to 3 pm for pavement inspection. last updated March 27 |
| |
| Closure - Interstate 95 |
Interstate 95 in both directions: from Exit 63 US 202 to Exit 75 US 202 lane closed due to night time construction work — until Wednesday, at about 6:00 AM EDT Comment: Between mile 65 in Gray and mile 68 in New Gloucester, north and southbound lane closures are scheduled nightly between the hours of 6 pm and 6 am Sunday, June 2 through Tuesday, June 4 for guardrail repairs and road maintenance operations. last updated yesterday at 5:52 PM EDT |
| |
| Closure - Interstate 295 |
Interstate 295 northbound: at Exit 15 US 1 exit ramp closed, road reconstruction -- detour in operation — until October 24 Comment: Town: YARMOUTH... Route: 1 & I-295 ..Description: Exit 15 ramps and park/ride lot last updated April 12 |
| |
| Closure - US 1 |
US 1: at New Hampshire State Line bridge closed No vehicles over 60000 lbs — until June 30, 2014 Comment: Rte 1 in Kittery Memorial bridge CLOSED ..permanently to Vehicle traffic. New bridge under construction ..Alternative routes for vehicle crossing between New Hampshire and Maine include the Sarah Mildred Long Bridge and I-95 high level Bridge last updated July 11 |
| |
| Closure - US 1 |
US 1: from after ME 136; Mallet Drive to before I-295 roadway reduced to one lane, paving operations, construction work — until July 31 Comment: Highway resurfacing: Beginning at Mallet Drive and continuing northerly for 1.39 miles. The project is likely to require drainage improvements in the vicinity of the new sidewalk constructed under PIN 13096.00. Starting May 17th through end of July last updated May 7 |
| |
| Closure - US 1 |
US 1: between US 1A and ME 162 roadway reopened to traffic, obstruction cleared Comment: Rte 1 Van Buren last updated today at 10:22 AM EDT |
| |
| Closure - US 201 |
US 201: from after ME 9; Maine Avenue to before US 202 roadway reduced to one lane because of road maintenance activities from 08:00am UTC -04:00 to 03:30pm UTC -04:00 on Tuesday and Wednesday — starting 8:00 AM, 06/04/13 until Wednesday, at about 3:30 PM EDT Comment: Rte 201 in Hallowell Winthrop St. to Maple St. Road will be reduced to one lane with flaggers drilling test holes weather permitting. last updated May 31 |
| |
| Closure - Maine 9 |
Maine 9: between State Route 193 and State Route 192 road open to traffic due to an earlier crash — Comment: Rte 9 in Beddington is open sending traffic around accident. last updated December 10 |
| |
| Closure - Maine 11 |
Maine 11: between State Route 6; State Route 16 and State Route 116; State Route 157 roadway reopened to traffic, obstruction cleared Comment: Rte 11 in Brownville Junction last updated today at 10:27 AM EDT |
| |
| Closure - Maine 113 |
Maine 113: at State Route 113B roadway reopened to traffic, obstruction cleared Comment: the road is reopen to traffic last updated today at 9:41 AM EDT |
| |
| Closure - Maine 113 |
Maine 113: at State Route 113B roadway reopened to traffic, obstruction cleared Comment: Rte 133B reopen to traffic last updated today at 2:55 PM EDT |
| |
| Closure - Maine 136 |
Maine 136: from after State Route 9; Swap Road to before I-495; Maine Turnpike roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights because there is work on the shoulder — until September 30 Comment: Route: Route 136 - Between Snow Road and Stackpole Road Highway Reconstruction and Slope Stabilization last updated April 30 |
| |
| Closure - Maine 179 |
Maine 179: between US Route 1A; Bangor Road and State Route 180 construction work, roadway reduced to one lane due to road work — until November 7 Comment: Rte 180 in Ellsworth 1000 feet in from Rte 1A road construction road relocation last updated August 31 |
| |
| Closure - Maine 224 |
Maine 224: from State Route 109 to after State Route 109 road closed because of construction work from 07:00am UTC -04:00 to 05:00pm UTC -04:00 on weekdays — until June 28 Comment: Route 224 is closed to through traffic 7am-5pm between Railroad Ave and Bridge/Payne Streets for the months of May and June. Its used frequently by east-west traffic as another option for Route 202 to avoid downtown Sanford. last updated May 13 |
| |
| Closure |
Boundary Line Road in Bridgewater: after US 1 roadway reduced to one lane because of bridge maintenance work Comment: Bridgewater the Tannery Road bridge reduced to one lane till further notice last updated May 14 |
| |
| Closure |
Falmouth Spur: between I-95 Turnpike and Falmouth Toll Plaza bridge construction, roadway reduced to one lane, speed restrictions in force -- affecting, eastbound traffic, westbound traffic Comment: At mile 1 on the Falmouth Spur east and westbound lane closures are scheduled from Monday April 16th until the completion of the project at the Presumpscot River Bridge in Falmouth. Work Zone speed limits are in effect. last updated April 13 |
| |
| Closure |
Local road in Fryeburg: after End of Route road closed, debris on roadway — Comment: Fish street in Fryeburg is closed due to downed trees and power lines. The fire dept. is on scene waiting for CMP. The crew has put up signs. last updated yesterday at 9:09 PM EDT |
| |
| Closure |
Local road in Fryeburg: after End of Route roadway reopened to traffic, obstruction cleared Comment: Fish street has been reopen to traffic last updated today at 9:42 AM EDT |
| |
| Closure |
Long Falls Road in Lexington Twp: after End of Route road closed, flooding — Comment: The Long Falls Dam road is closed. Flooding around 2035. Road has washed out. last updated yesterday at 6:29 PM EDT |
| |
| Closure |
Sly Brook Road in Eagle Lake: at End of Route roadway reduced to one lane, storm damage — Comment: The road is reduced to one lane near the Paradis road due to the road being undermined by the cross pipe. The crew has placed the necessary signs up. last updated yesterday at 8:17 PM EDT |
| |
| Closure |
Stow Road in Fryeburg: from after End of Route to after End of Route bridge closed -- follow the detour signs Comment: Town of Fryeburg RED IRON Bridge on the MCNEIL RD is closed Follow the detour signs.WILL BE DETOURING TRAFFIC DOWN OLD RIVER AND BACK ON TO HARBOR RD. last updated April 2 |
| |
| Closure |
Westbrook Street in Portland: from after End of Route to before Garrison Street alternating lane closures because of bridge maintenance work — starting 9:00 AM, 06/05/13 until Thursday, at about 3:00 PM EDT Comment: On the Westbrook Street Overpass in Portland that crosses over mile 47 on the Maine Turnpike, pavement repairs are scheduled between the hours of 9 am and 3 pm daily. Traffic will be reduced to one lane controlled by flaggers. No delays are expected, and emergency vehicles will be given priority. last updated yesterday at 6:39 PM EDT |